Building regulations for extensions in Devon
We prepare building regulations for extensions for homes across Devon, on their own or as the first stage of a full design and build project.
- Guide priceFrom £900 inc VAT
- Approval routeFull plans or building notice
- Towns covered9
- Site visitFree, no obligation

Covering Devon
Towns we cover in Devon include Plymouth, Exeter, Paignton, Torquay, Newton Abbot, Exmouth, Barnstaple, Bideford. In the South West, local stone, render and brick vary from town to town, so matching materials is a big part of designing an extension that looks right.
Included in a typical project
- Inspection bookings throughout the build
- Energy and glazing checks, including whole-house calculations if needed
- Structural calculations for beams, lintels and foundations
- Submission to the council or a registered building control approver
- Building regulations drawings and written specification
- Completion certificate on sign-off
Design and approval fees for Devon
Fees below are our Devon guide (×1.02, the South West England factor), including VAT. Council and building control fees are extra.
| Option | What it covers | Guide price |
|---|---|---|
| Essential | Building regulations drawings for a simple single-storey extension | £900 – £1,850 |
| Standard | Drawings plus structural calculations | £1,300 – £2,700 |
| Premium | Complex or two-storey pack with energy calculations | £2,200 – £3,900 |
Our design fee only. Building control charges are set by your council (or, in England and Wales, a registered building control approver) and quoted separately.
For a figure based on your own dimensions, use our guide-price tool.
Will the council need to approve it?
Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.
Homes in conservation areas, national parks, National Landscapes (formerly AONBs), the Broads and World Heritage Sites have tighter rules, so we always check the property's status and planning history before design starts.
Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.
Applications are decided by the local planning authority (your district, borough or unitary council).
What happens next
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
We visit your Devon home, measure up, talk through what you want and check the planning position.
Design and approvals
We draw the design, agree it with you and handle planning or permitted development checks and building regulations.
Fixed written price
We confirm the build price in writing, based on the approved drawings and the finishes you have chosen.
Build and sign-off
Our team builds the extension, keeps you updated weekly and finishes with building control sign-off.
Common questions in Devon
Do I need building regulations approval in Devon?
Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.
How long does this take for a Devon home?
2–5 weeks for drawings, depending on the council and the complexity of the project.
Who do I contract with in Devon?
Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.
Full plans or building notice?
A full plans application gets the drawings checked before work starts, which we usually recommend for extensions. A building notice is quicker to submit but carries more risk if something needs changing on site.
Who are building control?
Either your local council’s building control team or a registered building control approver. Both inspect the work and issue the completion certificate.
Book a free site visit in Devon
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.