house-extension.uk

Building regulations for extensions in Crowborough

Need building regulations for extensions in Crowborough? We survey the house, prepare what the council needs and deal with the officers until a decision is made.

  • Guide price in CrowboroughFrom £1,000 inc VAT
  • Approval routeFull plans or building notice
  • Timescale2–5 weeks for drawings
  • Postcode districtsTN6
Builder installing a steel beam over a new rear opening on acrow props

Working in Crowborough

Site visits are available across Crowborough (TN6). Nearby, we also take on projects in Uckfield (7 miles), Hailsham (14 miles), Bexhill-on-Sea (20 miles), Peacehaven (20 miles).

For homes towards Kent, Tunbridge Wells is around 7 miles away. Homes across the South East range from Victorian terraces in the older town centres to large detached houses on the edges, so the right extension type varies street by street.

Design and approval fees for Crowborough

Guide fees for Crowborough including VAT, using our South East England factor of ×1.12. Council and building control charges are not included.

OptionWhat it coversGuide price
EssentialBuilding regulations drawings for a simple single-storey extension£1,000 – £2,050
StandardDrawings plus structural calculations£1,450 – £2,950
PremiumComplex or two-storey pack with energy calculations£2,450 – £4,300

Our design fee only. Building control charges are set by your council (or, in England and Wales, a registered building control approver) and quoted separately.

For a figure based on your own dimensions, use our guide-price tool.

What is included

  • Submission to the council or a registered building control approver
  • Inspection bookings throughout the build
  • Structural calculations for beams, lintels and foundations
  • Building regulations drawings and written specification

Building regulations approval and planning permission are separate. A design can have planning consent and still need changes to meet the regulations, which is why we draw for both together.

Planning and approvals in Crowborough

Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.

In a conservation area, national park, National Landscape, the Broads or a World Heritage Site the permitted development limits are tighter (no side or two-storey extensions without an application). Listed homes need listed building consent, and if permitted development rights have been removed, any extension needs an application.

If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.

Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.

Applications are decided by the local planning authority (your district, borough or unitary council).

How the project works

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    First, a site visit: we look at the house, garden, access and drains and listen to what you need.

  2. Design and approvals

    Drawings are prepared and agreed with you, then submitted for the right planning route and building regulations approval.

  3. Fixed written price

    With the design and specification agreed, you get a fixed written price and a start date.

  4. Build and sign-off

    Our team builds the extension, keeps you updated weekly and finishes with building control sign-off.

Common questions in Crowborough

How long does this take for a Crowborough home?

2–5 weeks for drawings, depending on the council and the complexity of the project.

Do I need building regulations approval in Crowborough?

Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.

Do you cover all of Crowborough?

Yes. We cover Crowborough and the surrounding parts of East Sussex. Site visits are free and there is no obligation.

Full plans or building notice?

A full plans application gets the drawings checked before work starts, which we usually recommend for extensions. A building notice is quicker to submit but carries more risk if something needs changing on site.

Who are building control?

Either your local council’s building control team or a registered building control approver. Both inspect the work and issue the completion certificate.

Book a free site visit in Crowborough

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote