Building regulations for extensions across Crewe
For Crewe homeowners we handle building regulations for extensions, with fees agreed in writing before any work starts.
- Guide price in CreweFrom £850 inc VAT
- Approval routeFull plans or building notice
- Timescale2–5 weeks for drawings
- Postcode districtsCW1, CW2

Extensions in and around Crewe
Our survey diary covers Crewe, including CW1, CW2. Neighbouring towns we cover include Winsford (7 miles), Congleton (11 miles), Northwich (12 miles), Macclesfield (17 miles).
Across the North West, terraced houses with small rear yards suit compact rear and side return extensions, while suburban semis have room for more.
Who this service is for
- Every extension, whatever the planning route
- Glass-heavy designs that need energy calculations
- Homeowners using their own builder who need the drawings
Building regulations approval and planning permission are separate. A design can have planning consent and still need changes to meet the regulations, which is why we draw for both together.
Do I need planning permission in Crewe?
Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.
Before any drawing is finalised we check whether the house is listed, in a conservation area or subject to an Article 4 direction.
If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.
Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.
Applications are decided by the local planning authority (your district, borough or unitary council).
Fees in Crewe
Guide fees for Crewe including VAT, using our North West England factor of ×0.95. Council and building control charges are not included.
| Option | What it covers | Guide price |
|---|---|---|
| Essential | Building regulations drawings for a simple single-storey extension | £850 – £1,750 |
| Standard | Drawings plus structural calculations | £1,200 – £2,500 |
| Premium | Complex or two-storey pack with energy calculations | £2,050 – £3,650 |
Our design fee only. Building control charges are set by your council (or, in England and Wales, a registered building control approver) and quoted separately.
Try the guide-price tool to see a range for your own size and finish.
What happens next
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
We visit your Crewe home, measure up, talk through what you want and check the planning position.
Design and approvals
Once the layout is agreed, we deal with the council: planning permission or written confirmation that none is needed, plus building control.
Fixed written price
You receive a written, itemised price and programme. Nothing starts until you are happy with it.
Build and sign-off
Our team builds the extension, keeps you updated weekly and finishes with building control sign-off.
Common questions in Crewe
Do you cover all of Crewe?
Yes. We cover Crewe and the surrounding parts of Cheshire. Site visits are free and there is no obligation.
How long does this take for a Crewe home?
2–5 weeks for drawings, depending on the council and the complexity of the project.
Will my neighbours in Crewe be involved?
If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.
Full plans or building notice?
A full plans application gets the drawings checked before work starts, which we usually recommend for extensions. A building notice is quicker to submit but carries more risk if something needs changing on site.
Who are building control?
Either your local council’s building control team or a registered building control approver. Both inspect the work and issue the completion certificate.
Book a free site visit in Crewe
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.