house-extension.uk

Building regulations for extensions in Colwyn Bay

Need building regulations for extensions in Colwyn Bay? We survey the house, prepare what the council needs and deal with the officers until a decision is made.

  • Guide price in Colwyn BayFrom £800 inc VAT
  • Approval routeFull plans or building notice
  • Timescale2–5 weeks for drawings
  • Postcode districtsLL28, LL29
Builder installing a steel beam over a new rear opening on acrow props

Design and approval fees for Colwyn Bay

Fees below are our Colwyn Bay guide (×0.93, the Wales factor), including VAT. Council and building control fees are extra.

OptionWhat it coversGuide price
EssentialBuilding regulations drawings for a simple single-storey extension£800 – £1,700
StandardDrawings plus structural calculations£1,200 – £2,450
PremiumComplex or two-storey pack with energy calculations£2,000 – £3,550

Our design fee only. Building control charges are set by your council (or, in England and Wales, a registered building control approver) and quoted separately.Council fees are extra and are set by the Welsh Government.

For a figure based on your own dimensions, use our guide-price tool.

Who this service is for

  • Glass-heavy designs that need energy calculations
  • Every extension, whatever the planning route
  • Homeowners using their own builder who need the drawings

Building regulations approval and planning permission are separate. A design can have planning consent and still need changes to meet the regulations, which is why we draw for both together.

Working in Colwyn Bay

Our survey diary covers Colwyn Bay, including LL28, LL29. Neighbouring towns we cover include Llandudno (5 miles), Rhyl (10 miles), Prestatyn (13 miles), Flint (25 miles).

Bangor, Gwynedd, in Gwynedd, is roughly 17 miles from Colwyn Bay and also on our list. Welsh housing ranges from stone terraces in the valleys to render-and-slate houses and modern estates, and the Welsh planning rules differ from England's in several places.

Do I need planning permission in Colwyn Bay?

Building regulations approval is separate from planning. Wales has its own building regulations and approved documents; the council or a registered building control approver checks the plans, inspects the work and issues a completion certificate.

Before any drawing is finalised we check whether the house is listed, in a conservation area or subject to an Article 4 direction.

Building over or within 3 m of a public sewer needs the water company's consent before the foundations go in.

Applications are decided by the local planning authority (your county or county borough council, or the national park authority).

From first visit to completion

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    A designer visits, takes measurements and photos, and discusses layouts, budget and timing with you.

  2. Design and approvals

    We draw the design, agree it with you and handle planning or permitted development checks and building regulations.

  3. Fixed written price

    You receive a written, itemised price and programme. Nothing starts until you are happy with it.

  4. Build and sign-off

    We build it with one project manager, book the building control inspections and hand over the completion certificate.

Common questions in Colwyn Bay

Do you cover all of Colwyn Bay?

Yes. We cover Colwyn Bay and the surrounding parts of Clwyd. Site visits are free and there is no obligation.

Can I see a price before committing to anything?

Yes. The guide prices on this page are adjusted for Colwyn Bay, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.

How long does this take for a Colwyn Bay home?

2–5 weeks for drawings, depending on the council and the complexity of the project.

Full plans or building notice?

A full plans application gets the drawings checked before work starts, which we usually recommend for extensions. A building notice is quicker to submit but carries more risk if something needs changing on site.

Who are building control?

Either your local council’s building control team or a registered building control approver. Both inspect the work and issue the completion certificate.

Book a free site visit in Colwyn Bay

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote