Building regulations for extensions across Cheshunt
Need building regulations for extensions in Cheshunt? We survey the house, prepare what the council needs and deal with the officers until a decision is made.
- Guide price in CheshuntFrom £950 inc VAT
- Approval routeFull plans or building notice
- Timescale2–5 weeks for drawings
- Postcode districtsEN7, EN8, EN10

Do I need planning permission in Cheshunt?
Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.
The planning position for a specific Cheshunt address depends on its history and any designations, which is why we check it at the first visit.
Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.
If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.
Applications are decided by the local planning authority (your district, borough or unitary council).
What is included
- Structural calculations for beams, lintels and foundations
- Inspection bookings throughout the build
- Building regulations drawings and written specification
- Submission to the council or a registered building control approver
- Energy and glazing checks, including whole-house calculations if needed
- Completion certificate on sign-off
Working in Cheshunt
Our survey diary covers Cheshunt, including EN7, EN8, EN10. Nearby, we also take on projects in Hoddesdon (4 miles), Potters Bar (6 miles), Hertford (7 miles), Hatfield (9 miles).
Just over the Essex border, Waltham Abbey is about 1 mile away. Across the East of England many houses sit on generous plots, and single-storey and wraparound extensions are a natural fit.
Design and approval fees for Cheshunt
These are guide fees for Cheshunt, adjusted for East of England (×1.06) and including VAT. Council application and inspection fees are paid separately.
| Option | What it covers | Guide price |
|---|---|---|
| Essential | Building regulations drawings for a simple single-storey extension | £950 – £1,950 |
| Standard | Drawings plus structural calculations | £1,350 – £2,800 |
| Premium | Complex or two-storey pack with energy calculations | £2,300 – £4,050 |
Our design fee only. Building control charges are set by your council (or, in England and Wales, a registered building control approver) and quoted separately.
Want a range for your exact size? The guide-price tool takes about a minute.
From first visit to completion
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
A designer visits, takes measurements and photos, and discusses layouts, budget and timing with you.
Design and approvals
Once the layout is agreed, we deal with the council: planning permission or written confirmation that none is needed, plus building control.
Fixed written price
The price is fixed in writing once the design is settled, with a clear programme and payment stages.
Build and sign-off
Our team builds the extension, keeps you updated weekly and finishes with building control sign-off.
Questions answered
Will my neighbours in Cheshunt be involved?
If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.
How long does this take for a Cheshunt home?
2–5 weeks for drawings, depending on the council and the complexity of the project.
Do you cover all of Cheshunt?
Yes. We cover Cheshunt and the surrounding parts of Hertfordshire. Site visits are free and there is no obligation.
Full plans or building notice?
A full plans application gets the drawings checked before work starts, which we usually recommend for extensions. A building notice is quicker to submit but carries more risk if something needs changing on site.
Who are building control?
Either your local council’s building control team or a registered building control approver. Both inspect the work and issue the completion certificate.
Book a free site visit in Cheshunt
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.