house-extension.uk

Building regulations for extensions in Birmingham

For Birmingham homeowners we handle building regulations for extensions, with fees agreed in writing before any work starts.

  • Guide price in BirminghamFrom £850 inc VAT
  • Approval routeFull plans or building notice
  • Timescale2–5 weeks for drawings
  • Postcode districtsB1, B2, B3, B4, B5
Builder installing a steel beam over a new rear opening on acrow props

What we take care of

  • Completion certificate on sign-off
  • Energy and glazing checks, including whole-house calculations if needed
  • Submission to the council or a registered building control approver
  • Building regulations drawings and written specification

Design and approval fees for Birmingham

Guide fees for Birmingham including VAT, using our West Midlands factor of ×0.97. Council and building control charges are not included.

OptionWhat it coversGuide price
EssentialBuilding regulations drawings for a simple single-storey extension£850 – £1,750
StandardDrawings plus structural calculations£1,250 – £2,550
PremiumComplex or two-storey pack with energy calculations£2,100 – £3,700

Our design fee only. Building control charges are set by your council (or, in England and Wales, a registered building control approver) and quoted separately.

For a figure based on your own dimensions, use our guide-price tool.

Will the council need to approve it?

Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.

The planning position for a specific Birmingham address depends on its history and any designations, which is why we check it at the first visit.

If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.

Applications are decided by the local planning authority (your district, borough or unitary council).

Covering Birmingham

We cover Birmingham and the postcode districts B1, B2, B3, B4, B5, B19. We also work in nearby Smethwick (3 miles), West Bromwich (5 miles), Shirley (6 miles), Halesowen (7 miles).

Just over the Worcestershire border, Bromsgrove is about 12 miles away. The West Midlands has a large stock of 1930s and post-war semi-detached houses, which are well suited to rear, side and over-garage extensions, plus Victorian terraces in the older inner areas.

Our process, step by step

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    We visit your Birmingham home, measure up, talk through what you want and check the planning position.

  2. Design and approvals

    We draw the design, agree it with you and handle planning or permitted development checks and building regulations.

  3. Fixed written price

    The price is fixed in writing once the design is settled, with a clear programme and payment stages.

  4. Build and sign-off

    Our team builds the extension, keeps you updated weekly and finishes with building control sign-off.

Common questions in Birmingham

Who do I contract with in Birmingham?

Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.

Do you cover all of Birmingham?

Yes. We cover Birmingham and the surrounding parts of West Midlands. Site visits are free and there is no obligation.

Do I need building regulations approval in Birmingham?

Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.

Who are building control?

Either your local council’s building control team or a registered building control approver. Both inspect the work and issue the completion certificate.

Full plans or building notice?

A full plans application gets the drawings checked before work starts, which we usually recommend for extensions. A building notice is quicker to submit but carries more risk if something needs changing on site.

Book a free site visit in Birmingham

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote