Building regulations for extensions across Bedlington
Need building regulations for extensions in Bedlington? We survey the house, prepare what the council needs and deal with the officers until a decision is made.
- Guide price in BedlingtonFrom £800 inc VAT
- Approval routeFull plans or building notice
- Timescale2–5 weeks for drawings
- Postcode districtsNE22

Covering Bedlington
Site visits are available across Bedlington (NE22). Nearby, we also take on projects in Cramlington (3 miles), Blyth (3 miles), Ashington (3 miles), Morpeth (5 miles).
Just over the Tyne and Wear border, Whitley Bay is about 9 miles away. Across the North East, houses often have rear yards or modest gardens, so compact, well-lit single-storey extensions make the biggest difference.
What we take care of
- Structural calculations for beams, lintels and foundations
- Energy and glazing checks, including whole-house calculations if needed
- Completion certificate on sign-off
- Submission to the council or a registered building control approver
- Building regulations drawings and written specification
- Inspection bookings throughout the build
Planning and approvals in Bedlington
Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.
Homes in conservation areas, national parks, National Landscapes (formerly AONBs), the Broads and World Heritage Sites have tighter rules, so we always check the property's status and planning history before design starts.
If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.
Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.
Applications are decided by the local planning authority (your district, borough or unitary council).
What it costs in Bedlington
Fees below are our Bedlington guide (×0.91, the North East England factor), including VAT. Council and building control fees are extra.
| Option | What it covers | Guide price |
|---|---|---|
| Essential | Building regulations drawings for a simple single-storey extension | £800 – £1,650 |
| Standard | Drawings plus structural calculations | £1,150 – £2,400 |
| Premium | Complex or two-storey pack with energy calculations | £2,000 – £3,500 |
Our design fee only. Building control charges are set by your council (or, in England and Wales, a registered building control approver) and quoted separately.
Want a range for your exact size? The guide-price tool takes about a minute.
From first visit to completion
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
A designer visits, takes measurements and photos, and discusses layouts, budget and timing with you.
Design and approvals
Once the layout is agreed, we deal with the council: planning permission or written confirmation that none is needed, plus building control.
Fixed written price
The price is fixed in writing once the design is settled, with a clear programme and payment stages.
Build and sign-off
Work is carried out to the agreed programme, inspected by building control and signed off at the end.
Questions answered
Can I see a price before committing to anything?
Yes. The guide prices on this page are adjusted for Bedlington, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.
Will my neighbours in Bedlington be involved?
If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.
Who do I contract with in Bedlington?
Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.
Full plans or building notice?
A full plans application gets the drawings checked before work starts, which we usually recommend for extensions. A building notice is quicker to submit but carries more risk if something needs changing on site.
Who are building control?
Either your local council’s building control team or a registered building control approver. Both inspect the work and issue the completion certificate.
Book a free site visit in Bedlington
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.