Double-storey extensions in Yarm

If you live in Yarm and want more space without moving, a double-storey extension is one of the most practical ways to get it. We handle the drawings, approvals and the build.

  • Guide price in YarmFrom £34,500 inc VAT
  • PlanningUsually a householder application
  • Build time16–24 weeks on site
  • Postcode districtsTS15, TS16
Two-storey rear extension on a brick semi-detached house with a hipped roof

Double-storey extension prices in Yarm

Prices below are for Yarm, using the North East England factor of ×0.91. They are guide ranges including VAT for the build only, not a quote.

Typical rates in Yarm: £1,410 to £2,730 per m² including VAT, depending on specification.

SizeEssentialStandardPremium
3 m × 4 m, two floors
24 m²
£34,500 – £41,500£39,000 – £51,500£50,000 – £66,000
4 m × 4 m, two floors
32 m²
£45,000 – £54,000£52,000 – £68,500£66,500 – £87,500
4 m × 6 m, two floors
48 m²
£67,500 – £81,000£78,500 – £103,000£100,000 – £131,500

Try the guide-price tool to see a range for your own size and finish.

Do I need planning permission in Yarm?

In England a two-storey rear extension is permitted development only if it projects no more than 3 m from the original rear wall, sits at least 7 m from the rear boundary, matches the roof pitch and uses obscure, non-opening side windows upstairs. Most two-storey extensions therefore go through a householder planning application, which costs £548 from 1 April 2026 and normally takes about 8 weeks.

In a conservation area, national park, National Landscape, the Broads or a World Heritage Site the permitted development limits are tighter (no side or two-storey extensions without an application). Listed homes need listed building consent, and if permitted development rights have been removed, any extension needs an application.

If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.

Applications are decided by the local planning authority (your district, borough or unitary council).

What we take care of

  • Building regulations drawings and structural design
  • Measured survey, design and planning drawings
  • Householder planning application where needed
  • Breaking through at both levels, stairs and landing changes where needed
  • Foundations sized for two floors

Extensions in and around Yarm

Site visits are available across Yarm (TS15, TS16). Nearby, we also take on projects in Thornaby-on-Tees (3 miles), Stockton-on-Tees (5 miles), Billingham (6 miles), Darlington (8 miles).

For homes towards North Yorkshire, Middlesbrough is around 7 miles away. Across the North East, houses often have rear yards or modest gardens, so compact, well-lit single-storey extensions make the biggest difference.

From first visit to completion

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    We visit your Yarm home, measure up, talk through what you want and check the planning position.

  2. Design and approvals

    Drawings are prepared and agreed with you, then submitted for the right planning route and building regulations approval.

  3. Fixed written price

    With the design and specification agreed, you get a fixed written price and a start date.

  4. Build and sign-off

    We build it with one project manager, book the building control inspections and hand over the completion certificate.

Questions people ask about double-storey extensions

Will my neighbours in Yarm be involved?

If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.

Who do I contract with for a double-storey extension in Yarm?

Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.

How long does a double-storey extension take to build in Yarm?

On site, typically 16 to 24 weeks once approvals are in place. Before that, allow 8–16 weeks design and approvals.

Does a double-storey extension need planning permission?

Often, yes. In England a two-storey rear extension can be permitted development only if it projects no more than 3 m and sits at least 7 m from the rear boundary, with matching roof pitch and obscure side windows. Side extensions over one storey always need planning permission. We confirm the route at the survey.

Do I need a Party Wall Agreement?

If you are in England or Wales and the work involves a shared wall or digging foundations close to a neighbour, the Party Wall etc. Act 1996 applies and notices must be served before work starts. We tell you which notices are needed.

Book a free site visit in Yarm

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote