Double-storey extensions in Wokingham
Wokingham homeowners can use us for the whole double-storey extension project: survey, design, planning or permitted development checks, building regulations and the build itself.
- Guide price in WokinghamFrom £42,500 inc VAT
- PlanningUsually a householder application
- Build time16–24 weeks on site
- Postcode districtsRG40, RG41

Included in a typical project
- Measured survey, design and planning drawings
- Building regulations drawings and structural design
- Ground and first floor structure, roof tied into the existing roof
- Insulation, plastering, electrics and plumbing to finish
- Breaking through at both levels, stairs and landing changes where needed
Working in Wokingham
Site visits are available across Wokingham (RG40, RG41). The same team covers Crowthorne (3 miles), Bracknell (4 miles), Earley (4 miles), Sandhurst (5 miles), all within easy reach.
Homes across the South East range from Victorian terraces in the older town centres to large detached houses on the edges, so the right extension type varies street by street.
Planning and approvals in Wokingham
In England a two-storey rear extension is permitted development only if it projects no more than 3 m from the original rear wall, sits at least 7 m from the rear boundary, matches the roof pitch and uses obscure, non-opening side windows upstairs. Most two-storey extensions therefore go through a householder planning application, which costs £548 from 1 April 2026 and normally takes about 8 weeks.
In a conservation area, national park, National Landscape, the Broads or a World Heritage Site the permitted development limits are tighter (no side or two-storey extensions without an application). Listed homes need listed building consent, and if permitted development rights have been removed, any extension needs an application.
If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.
Applications are decided by the local planning authority (your district, borough or unitary council).
Double-storey extension prices in Wokingham
For Wokingham we adjust our national guide rates by ×1.12, the factor we use for South East England. Figures include VAT; your written quote after the survey replaces them.
Typical rates in Wokingham: £1,740 to £3,360 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| 3 m × 4 m, two floors 24 m² | £42,500 – £51,000 | £48,000 – £63,500 | £61,500 – £81,000 |
| 4 m × 4 m, two floors 32 m² | £55,500 – £66,500 | £64,500 – £84,500 | £82,000 – £108,000 |
| 4 m × 6 m, two floors 48 m² | £83,000 – £99,500 | £96,500 – £126,500 | £123,500 – £161,500 |
Try the guide-price tool to see a range for your own size and finish.
How the project works
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
We visit your Wokingham home, measure up, talk through what you want and check the planning position.
Design and approvals
We produce the drawings and structural design, and manage the approvals so they are in place before work starts.
Fixed written price
We confirm the build price in writing, based on the approved drawings and the finishes you have chosen.
Build and sign-off
Our team builds the extension, keeps you updated weekly and finishes with building control sign-off.
Common questions in Wokingham
Do I need building regulations approval in Wokingham?
Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.
How long does a double-storey extension take to build in Wokingham?
On site, typically 16 to 24 weeks once approvals are in place. Before that, allow 8–16 weeks design and approvals.
Do you cover all of Wokingham?
Yes. We cover Wokingham and the surrounding parts of Berkshire. Site visits are free and there is no obligation.
Is a two-storey extension cheaper per square metre?
Usually. Our guide range is about £1,740 to £3,360 per m² of new floor area including VAT, compared with £1,960 to £3,810 per m² for single-storey work, because the foundations and roof are shared across two floors.
Do I need a Party Wall Agreement?
If you are in England or Wales and the work involves a shared wall or digging foundations close to a neighbour, the Party Wall etc. Act 1996 applies and notices must be served before work starts. We tell you which notices are needed.
Book a free site visit in Wokingham
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.