Double-storey extensions across Wimborne Minster
From the first sketch to final sign-off, we plan and build double-storey extensions in Wimborne Minster and the surrounding Dorset area.
- Guide price in Wimborne MinsterFrom £38,500 inc VAT
- PlanningUsually a householder application
- Build time16–24 weeks on site
- Postcode districtsBH21

What should I budget for a double-storey extension in Wimborne Minster?
For Wimborne Minster we adjust our national guide rates by ×1.02, the factor we use for South West England. Figures include VAT; your written quote after the survey replaces them.
Typical rates in Wimborne Minster: £1,580 to £3,060 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| 3 m × 4 m, two floors 24 m² | £38,500 – £46,500 | £44,000 – £58,000 | £56,000 – £73,500 |
| 4 m × 4 m, two floors 32 m² | £50,500 – £60,500 | £58,500 – £77,000 | £75,000 – £98,000 |
| 4 m × 6 m, two floors 48 m² | £75,500 – £91,000 | £88,000 – £115,500 | £112,500 – £147,000 |
Want a range for your exact size? The guide-price tool takes about a minute.
Who a double-storey extension suits
- Homeowners who would otherwise consider moving
- Growing families who need a bedroom as well as a bigger kitchen
- Houses with enough distance to the rear or side boundary
Do I need planning permission in Wimborne Minster?
In England a two-storey rear extension is permitted development only if it projects no more than 3 m from the original rear wall, sits at least 7 m from the rear boundary, matches the roof pitch and uses obscure, non-opening side windows upstairs. Most two-storey extensions therefore go through a householder planning application, which costs £548 from 1 April 2026 and normally takes about 8 weeks.
Homes in conservation areas, national parks, National Landscapes (formerly AONBs), the Broads and World Heritage Sites have tighter rules, so we always check the property's status and planning history before design starts.
Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.
Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.
Applications are decided by the local planning authority (your district, borough or unitary council).
Covering Wimborne Minster
Site visits are available across Wimborne Minster (BH21). We also work in nearby Ferndown (4 miles), Poole (7 miles), Bournemouth (8 miles), Christchurch (10 miles).
New Milton, in Hampshire, is roughly 14 miles from Wimborne Minster and also on our list. South West homes range from terraced streets in the cities to stone cottages and bungalows in the countryside, and conservation areas are common in historic centres.
How the project works
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
We visit your Wimborne Minster home, measure up, talk through what you want and check the planning position.
Design and approvals
We draw the design, agree it with you and handle planning or permitted development checks and building regulations.
Fixed written price
You receive a written, itemised price and programme. Nothing starts until you are happy with it.
Build and sign-off
We build it with one project manager, book the building control inspections and hand over the completion certificate.
Questions people ask about double-storey extensions
Can I see a price before committing to anything?
Yes. The guide prices on this page are adjusted for Wimborne Minster, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.
Will my neighbours in Wimborne Minster be involved?
If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.
Who do I contract with for a double-storey extension in Wimborne Minster?
Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.
Do I need a Party Wall Agreement?
If you are in England or Wales and the work involves a shared wall or digging foundations close to a neighbour, the Party Wall etc. Act 1996 applies and notices must be served before work starts. We tell you which notices are needed.
Does a double-storey extension need planning permission?
Often, yes. In England a two-storey rear extension can be permitted development only if it projects no more than 3 m and sits at least 7 m from the rear boundary, with matching roof pitch and obscure side windows. Side extensions over one storey always need planning permission. We confirm the route at the survey.
Book a free site visit in Wimborne Minster
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.