house-extension.uk

Double-storey extensions in Swadlincote: design, approvals and build

Swadlincote homeowners can use us for the whole double-storey extension project: survey, design, planning or permitted development checks, building regulations and the build itself.

  • Guide price in SwadlincoteFrom £36,000 inc VAT
  • PlanningUsually a householder application
  • Build time16–24 weeks on site
  • Postcode districtsDE11
Two-storey rear extension on a brick semi-detached house with a hipped roof

Included in a typical project

  • Foundations sized for two floors
  • Measured survey, design and planning drawings
  • Householder planning application where needed
  • Breaking through at both levels, stairs and landing changes where needed

Guide prices for Swadlincote

Labour and material costs vary across the UK, so for Swadlincote we use our East Midlands factor (×0.95). The ranges include VAT and exclude design, structural and council fees.

Typical rates in Swadlincote: £1,470 to £2,850 per m² including VAT, depending on specification.

SizeEssentialStandardPremium
3 m × 4 m, two floors
24 m²
£36,000 – £43,500£41,000 – £54,000£52,000 – £68,500
4 m × 4 m, two floors
32 m²
£47,000 – £56,500£54,500 – £71,500£69,500 – £91,500
4 m × 6 m, two floors
48 m²
£70,500 – £84,500£82,000 – £107,500£104,500 – £137,000

Try the guide-price tool to see a range for your own size and finish.

Planning rules that apply in Swadlincote

In England a two-storey rear extension is permitted development only if it projects no more than 3 m from the original rear wall, sits at least 7 m from the rear boundary, matches the roof pitch and uses obscure, non-opening side windows upstairs. Most two-storey extensions therefore go through a householder planning application, which costs £548 from 1 April 2026 and normally takes about 8 weeks.

Homes in conservation areas, national parks, National Landscapes (formerly AONBs), the Broads and World Heritage Sites have tighter rules, so we always check the property's status and planning history before design starts.

If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.

Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.

Applications are decided by the local planning authority (your district, borough or unitary council).

Covering Swadlincote

We cover Swadlincote and the postcode districts DE11. Neighbouring towns we cover include Derby (11 miles), Long Eaton (15 miles), Ilkeston (17 miles), Belper (18 miles).

Burton upon Trent, in Staffordshire, is roughly 4 miles from Swadlincote and also on our list. The East Midlands has plenty of inter-war and post-war semis and detached houses with room to extend, alongside Victorian terraces in the towns.

From first visit to completion

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    A designer visits, takes measurements and photos, and discusses layouts, budget and timing with you.

  2. Design and approvals

    Once the layout is agreed, we deal with the council: planning permission or written confirmation that none is needed, plus building control.

  3. Fixed written price

    The price is fixed in writing once the design is settled, with a clear programme and payment stages.

  4. Build and sign-off

    Our team builds the extension, keeps you updated weekly and finishes with building control sign-off.

Your questions about a double-storey extension in Swadlincote

How long does a double-storey extension take to build in Swadlincote?

On site, typically 16 to 24 weeks once approvals are in place. Before that, allow 8–16 weeks design and approvals.

Will my neighbours in Swadlincote be involved?

If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.

Who do I contract with for a double-storey extension in Swadlincote?

Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.

Is a two-storey extension cheaper per square metre?

Usually. Our guide range is about £1,470 to £2,850 per m² of new floor area including VAT, compared with £1,660 to £3,230 per m² for single-storey work, because the foundations and roof are shared across two floors.

Do I need a Party Wall Agreement?

If you are in England or Wales and the work involves a shared wall or digging foundations close to a neighbour, the Party Wall etc. Act 1996 applies and notices must be served before work starts. We tell you which notices are needed.

Book a free site visit in Swadlincote

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote