Ruislip double-storey extensions, designed and built
Our design and build teams take on double-storey extensions in Ruislip, from the first measured survey through planning and building control to the finished room.
- Guide price in RuislipFrom £49,000 inc VAT
- PlanningUsually a householder application
- Build time16–24 weeks on site
- Postcode districtsHA4, HA5, UB10

What is included
- Breaking through at both levels, stairs and landing changes where needed
- Foundations sized for two floors
- Ground and first floor structure, roof tied into the existing roof
- Insulation, plastering, electrics and plumbing to finish
Working in Ruislip
Across HA4, HA5, UB10, we can visit, measure and advise. The same team covers South Ruislip (1 mile), Pinner (2 miles), Northolt (3 miles), Uxbridge (3 miles), all within easy reach.
For homes towards Hertfordshire, Rickmansworth is around 5 miles away. London's housing is dominated by Victorian and Edwardian terraces, many with a rear outrigger and a side return, and 1930s semis in the outer boroughs. Conservation areas are common, so the planning check comes first.
How much does a double-storey extension cost in Ruislip?
Labour and material costs vary across the UK, so for Ruislip we use our London factor (×1.3). The ranges include VAT and exclude design, structural and council fees.
Typical rates in Ruislip: £2,020 to £3,900 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| 3 m × 4 m, two floors 24 m² | £49,000 – £59,000 | £56,000 – £73,500 | £71,500 – £94,000 |
| 4 m × 4 m, two floors 32 m² | £64,000 – £77,000 | £74,500 – £98,000 | £95,500 – £125,000 |
| 4 m × 6 m, two floors 48 m² | £96,500 – £115,500 | £112,000 – £147,000 | £143,500 – £187,500 |
Want a range for your exact size? The guide-price tool takes about a minute.
Do I need planning permission in Ruislip?
In England a two-storey rear extension is permitted development only if it projects no more than 3 m from the original rear wall, sits at least 7 m from the rear boundary, matches the roof pitch and uses obscure, non-opening side windows upstairs. Most two-storey extensions therefore go through a householder planning application, which costs £548 from 1 April 2026 and normally takes about 8 weeks.
Before any drawing is finalised we check whether the house is listed, in a conservation area or subject to an Article 4 direction.
Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.
Applications are decided by the local planning authority (your district, borough or unitary council).
Our process, step by step
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
A designer visits, takes measurements and photos, and discusses layouts, budget and timing with you.
Design and approvals
Drawings are prepared and agreed with you, then submitted for the right planning route and building regulations approval.
Fixed written price
With the design and specification agreed, you get a fixed written price and a start date.
Build and sign-off
We build it with one project manager, book the building control inspections and hand over the completion certificate.
Questions people ask about double-storey extensions
How long does a double-storey extension take to build in Ruislip?
On site, typically 16 to 24 weeks once approvals are in place. Before that, allow 8–16 weeks design and approvals.
Do you cover all of Ruislip?
Yes. We cover Ruislip and the surrounding parts of Greater London. Site visits are free and there is no obligation.
Can I see a price before committing to anything?
Yes. The guide prices on this page are adjusted for Ruislip, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.
Do I need a Party Wall Agreement?
If you are in England or Wales and the work involves a shared wall or digging foundations close to a neighbour, the Party Wall etc. Act 1996 applies and notices must be served before work starts. We tell you which notices are needed.
Is a two-storey extension cheaper per square metre?
Usually. Our guide range is about £2,020 to £3,900 per m² of new floor area including VAT, compared with £2,280 to £4,420 per m² for single-storey work, because the foundations and roof are shared across two floors.
Book a free site visit in Ruislip
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.