Double-storey extensions in Rugby: design, approvals and build

From the first sketch to final sign-off, we plan and build double-storey extensions in Rugby and the surrounding Warwickshire area.

  • Guide price in RugbyFrom £36,500 inc VAT
  • PlanningUsually a householder application
  • Build time16–24 weeks on site
  • Postcode districtsCV21, CV22, CV23
Two-storey rear extension on a brick semi-detached house with a hipped roof

What should I budget for a double-storey extension in Rugby?

Labour and material costs vary across the UK, so for Rugby we use our West Midlands factor (×0.97). The ranges include VAT and exclude design, structural and council fees.

Typical rates in Rugby: £1,500 to £2,910 per m² including VAT, depending on specification.

SizeEssentialStandardPremium
3 m × 4 m, two floors
24 m²
£36,500 – £44,000£41,500 – £55,000£53,500 – £70,000
4 m × 4 m, two floors
32 m²
£48,000 – £57,500£55,500 – £73,000£71,000 – £93,500
4 m × 6 m, two floors
48 m²
£72,000 – £86,500£83,500 – £109,500£107,000 – £140,000

For a figure based on your own dimensions, use our guide-price tool.

Planning and approvals in Rugby

In England a two-storey rear extension is permitted development only if it projects no more than 3 m from the original rear wall, sits at least 7 m from the rear boundary, matches the roof pitch and uses obscure, non-opening side windows upstairs. Most two-storey extensions therefore go through a householder planning application, which costs £548 from 1 April 2026 and normally takes about 8 weeks.

Homes in conservation areas, national parks, National Landscapes (formerly AONBs), the Broads and World Heritage Sites have tighter rules, so we always check the property's status and planning history before design starts.

Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.

Applications are decided by the local planning authority (your district, borough or unitary council).

Local to Rugby

Across CV21, CV22, CV23, we can visit, measure and advise. We also work in nearby Bedworth (11 miles), Leamington Spa (12 miles), Nuneaton (14 miles), Kenilworth (14 miles).

Across the West Midlands, brick-built semis with long gardens are common, so single-storey and two-storey rear extensions are popular choices.

What is included

  • Foundations sized for two floors
  • Householder planning application where needed
  • Breaking through at both levels, stairs and landing changes where needed
  • Insulation, plastering, electrics and plumbing to finish

From first visit to completion

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    We visit your Rugby home, measure up, talk through what you want and check the planning position.

  2. Design and approvals

    We produce the drawings and structural design, and manage the approvals so they are in place before work starts.

  3. Fixed written price

    The price is fixed in writing once the design is settled, with a clear programme and payment stages.

  4. Build and sign-off

    Our team builds the extension, keeps you updated weekly and finishes with building control sign-off.

Common questions in Rugby

Will my neighbours in Rugby be involved?

If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.

How long does a double-storey extension take to build in Rugby?

On site, typically 16 to 24 weeks once approvals are in place. Before that, allow 8–16 weeks design and approvals.

Can I see a price before committing to anything?

Yes. The guide prices on this page are adjusted for Rugby, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.

Do I need a Party Wall Agreement?

If you are in England or Wales and the work involves a shared wall or digging foundations close to a neighbour, the Party Wall etc. Act 1996 applies and notices must be served before work starts. We tell you which notices are needed.

Is a two-storey extension cheaper per square metre?

Usually. Our guide range is about £1,500 to £2,910 per m² of new floor area including VAT, compared with £1,700 to £3,300 per m² for single-storey work, because the foundations and roof are shared across two floors.

Book a free site visit in Rugby

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote