house-extension.uk

Double-storey extensions across Rhyl

We design and build double-storey extensions for houses in Rhyl, with a written price once the survey and design are done and one point of contact throughout.

  • Guide price in RhylFrom £35,000 inc VAT
  • PlanningUsually a planning application
  • Build time16–24 weeks on site
  • Postcode districtsLL18
Two-storey rear extension on a brick semi-detached house with a hipped roof

Working in Rhyl

Site visits are available across Rhyl (LL18). The same team covers Prestatyn (4 miles), Colwyn Bay (10 miles), Llandudno (14 miles), Flint (16 miles), all within easy reach.

Just over the Gwynedd border, Bangor, Gwynedd is about 27 miles away. In Wales, terraced houses with rear offshoots are common in the towns, while detached houses and bungalows dominate in rural areas.

Guide prices for Rhyl

Labour and material costs vary across the UK, so for Rhyl we use our Wales factor (×0.93). The ranges include VAT and exclude design, structural and council fees.

Typical rates in Rhyl: £1,440 to £2,790 per m² including VAT, depending on specification.

SizeEssentialStandardPremium
3 m × 4 m, two floors
24 m²
£35,000 – £42,500£40,000 – £52,500£51,000 – £67,000
4 m × 4 m, two floors
32 m²
£46,000 – £55,500£53,500 – £70,000£68,000 – £89,500
4 m × 6 m, two floors
48 m²
£69,000 – £83,000£80,000 – £105,000£102,500 – £134,000

Try the guide-price tool to see a range for your own size and finish.

Included in a typical project

  • Ground and first floor structure, roof tied into the existing roof
  • Foundations sized for two floors
  • Insulation, plastering, electrics and plumbing to finish
  • Householder planning application where needed
  • Building regulations drawings and structural design
  • Breaking through at both levels, stairs and landing changes where needed

Will the council need to approve it?

In Wales a rear extension of more than one storey can be permitted development only if the ground floor projects no more than 4 m, the upper floor no more than 3 m, it stays at least 10.5 m from the rear boundary and it is not in a conservation area, national park, National Landscape or World Heritage Site. Anything larger needs a planning application to the council.

Homes in conservation areas, national parks, National Landscapes (AONBs) and World Heritage Sites have tighter rules, so we always check the property's status and planning history before design starts.

Building regulations approval is separate from planning. Wales has its own building regulations and approved documents; the council or a registered building control approver checks the plans, inspects the work and issues a completion certificate.

Building over or within 3 m of a public sewer needs the water company's consent before the foundations go in.

Applications are decided by the local planning authority (your county or county borough council, or the national park authority).

Our process, step by step

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    First, a site visit: we look at the house, garden, access and drains and listen to what you need.

  2. Design and approvals

    We produce the drawings and structural design, and manage the approvals so they are in place before work starts.

  3. Fixed written price

    The price is fixed in writing once the design is settled, with a clear programme and payment stages.

  4. Build and sign-off

    Our team builds the extension, keeps you updated weekly and finishes with building control sign-off.

Double-storey extension questions answered

Who do I contract with for a double-storey extension in Rhyl?

Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.

Do I need building regulations approval in Rhyl?

Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.

How long does a double-storey extension take to build in Rhyl?

On site, typically 16 to 24 weeks once approvals are in place. Before that, allow 8–16 weeks design and approvals.

Is a two-storey extension cheaper per square metre?

Usually. Our guide range is about £1,440 to £2,790 per m² of new floor area including VAT, compared with £1,630 to £3,160 per m² for single-storey work, because the foundations and roof are shared across two floors.

Book a free site visit in Rhyl

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote