Double-storey extensions across Penrith
From the first sketch to final sign-off, we plan and build double-storey extensions in Penrith and the surrounding Cumbria area.
- Guide price in PenrithFrom £36,000 inc VAT
- PlanningUsually a householder application
- Build time16–24 weeks on site
- Postcode districtsCA11

How much does a double-storey extension cost in Penrith?
For Penrith we adjust our national guide rates by ×0.95, the factor we use for North West England. Figures include VAT; your written quote after the survey replaces them.
Typical rates in Penrith: £1,470 to £2,850 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| 3 m × 4 m, two floors 24 m² | £36,000 – £43,500 | £41,000 – £54,000 | £52,000 – £68,500 |
| 4 m × 4 m, two floors 32 m² | £47,000 – £56,500 | £54,500 – £71,500 | £69,500 – £91,500 |
| 4 m × 6 m, two floors 48 m² | £70,500 – £84,500 | £82,000 – £107,500 | £104,500 – £137,000 |
For a figure based on your own dimensions, use our guide-price tool.
Working in Penrith
Across CA11, we can visit, measure and advise. The same team covers Carlisle (17 miles), Kendal (23 miles), Workington (30 miles), Whitehaven (33 miles), all within easy reach.
For homes towards Northumberland, Hexham is around 35 miles away. The North West has a high share of Victorian and Edwardian terraces with rear yards and outriggers, plus large areas of inter-war semis in the suburbs.
Planning and approvals in Penrith
In England a two-storey rear extension is permitted development only if it projects no more than 3 m from the original rear wall, sits at least 7 m from the rear boundary, matches the roof pitch and uses obscure, non-opening side windows upstairs. Most two-storey extensions therefore go through a householder planning application, which costs £548 from 1 April 2026 and normally takes about 8 weeks.
The planning position for a specific Penrith address depends on its history and any designations, which is why we check it at the first visit.
Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.
Applications are decided by the local planning authority (your district, borough or unitary council).
Is a double-storey extension right for your house?
- Growing families who need a bedroom as well as a bigger kitchen
- Houses with enough distance to the rear or side boundary
- Homeowners who would otherwise consider moving
The roof is what makes a two-storey extension look right or wrong. We match the pitch and materials of the main house wherever possible and plan the upstairs layout around the existing landing so the new rooms feel original rather than bolted on.
How the project works
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
A designer visits, takes measurements and photos, and discusses layouts, budget and timing with you.
Design and approvals
We produce the drawings and structural design, and manage the approvals so they are in place before work starts.
Fixed written price
We confirm the build price in writing, based on the approved drawings and the finishes you have chosen.
Build and sign-off
Work is carried out to the agreed programme, inspected by building control and signed off at the end.
Your questions about a double-storey extension in Penrith
How long does a double-storey extension take to build in Penrith?
On site, typically 16 to 24 weeks once approvals are in place. Before that, allow 8–16 weeks design and approvals.
Will my neighbours in Penrith be involved?
If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.
Do you cover all of Penrith?
Yes. We cover Penrith and the surrounding parts of Cumbria. Site visits are free and there is no obligation.
Does a double-storey extension need planning permission?
Often, yes. In England a two-storey rear extension can be permitted development only if it projects no more than 3 m and sits at least 7 m from the rear boundary, with matching roof pitch and obscure side windows. Side extensions over one storey always need planning permission. We confirm the route at the survey.
Do I need a Party Wall Agreement?
If you are in England or Wales and the work involves a shared wall or digging foundations close to a neighbour, the Party Wall etc. Act 1996 applies and notices must be served before work starts. We tell you which notices are needed.
Book a free site visit in Penrith
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .