Double-storey extensions across Oakham
Our design and build teams take on double-storey extensions in Oakham, from the first measured survey through planning and building control to the finished room.
- Guide price in OakhamFrom £36,000 inc VAT
- PlanningUsually a householder application
- Build time16–24 weeks on site
- Postcode districtsLE15

Who a double-storey extension suits
- Homeowners who would otherwise consider moving
- Houses with enough distance to the rear or side boundary
- Growing families who need a bedroom as well as a bigger kitchen
Double-storey extension prices in Oakham
Labour and material costs vary across the UK, so for Oakham we use our East Midlands factor (×0.95). The ranges include VAT and exclude design, structural and council fees.
Typical rates in Oakham: £1,470 to £2,850 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| 3 m × 4 m, two floors 24 m² | £36,000 – £43,500 | £41,000 – £54,000 | £52,000 – £68,500 |
| 4 m × 4 m, two floors 32 m² | £47,000 – £56,500 | £54,500 – £71,500 | £69,500 – £91,500 |
| 4 m × 6 m, two floors 48 m² | £70,500 – £84,500 | £82,000 – £107,500 | £104,500 – £137,000 |
Try the guide-price tool to see a range for your own size and finish.
Planning and approvals in Oakham
In England a two-storey rear extension is permitted development only if it projects no more than 3 m from the original rear wall, sits at least 7 m from the rear boundary, matches the roof pitch and uses obscure, non-opening side windows upstairs. Most two-storey extensions therefore go through a householder planning application, which costs £548 from 1 April 2026 and normally takes about 8 weeks.
In a conservation area, national park, National Landscape, the Broads or a World Heritage Site the permitted development limits are tighter (no side or two-storey extensions without an application). Listed homes need listed building consent, and if permitted development rights have been removed, any extension needs an application.
If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.
Applications are decided by the local planning authority (your district, borough or unitary council).
Covering Oakham
Our survey diary covers Oakham, including LE15. Nearby, we also take on projects in Uppingham (0 miles).
Homes across the East Midlands often have usable side land or a driveway beside the house, which opens up side and wraparound options.
Our process, step by step
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
It starts with a visit to your house to measure, check access and talk through ideas and budget.
Design and approvals
We draw the design, agree it with you and handle planning or permitted development checks and building regulations.
Fixed written price
We confirm the build price in writing, based on the approved drawings and the finishes you have chosen.
Build and sign-off
The build is managed from start to finish, inspected at each stage and signed off on completion.
Common questions in Oakham
Do you cover all of Oakham?
Yes. We cover Oakham and the surrounding parts of Rutland. Site visits are free and there is no obligation.
Can I see a price before committing to anything?
Yes. The guide prices on this page are adjusted for Oakham, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.
Will my neighbours in Oakham be involved?
If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.
Do I need a Party Wall Agreement?
If you are in England or Wales and the work involves a shared wall or digging foundations close to a neighbour, the Party Wall etc. Act 1996 applies and notices must be served before work starts. We tell you which notices are needed.
Does a double-storey extension need planning permission?
Often, yes. In England a two-storey rear extension can be permitted development only if it projects no more than 3 m and sits at least 7 m from the rear boundary, with matching roof pitch and obscure side windows. Side extensions over one storey always need planning permission. We confirm the route at the survey.
Book a free site visit in Oakham
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end