Edmonton double-storey extensions, designed and built
If you live in Edmonton and want more space without moving, a double-storey extension is one of the most practical ways to get it. We handle the drawings, approvals and the build.
- Guide price in EdmontonFrom £49,000 inc VAT
- PlanningUsually a householder application
- Build time16–24 weeks on site
- Postcode districtsEN1, N9, N13, N17, N18

Double-storey extension prices in Edmonton
Prices below are for Edmonton, using the London factor of ×1.3. They are guide ranges including VAT for the build only, not a quote.
Typical rates in Edmonton: £2,020 to £3,900 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| 3 m × 4 m, two floors 24 m² | £49,000 – £59,000 | £56,000 – £73,500 | £71,500 – £94,000 |
| 4 m × 4 m, two floors 32 m² | £64,000 – £77,000 | £74,500 – £98,000 | £95,500 – £125,000 |
| 4 m × 6 m, two floors 48 m² | £96,500 – £115,500 | £112,000 – £147,000 | £143,500 – £187,500 |
For a figure based on your own dimensions, use our guide-price tool.
Local to Edmonton
Postcode districts we cover around Edmonton include EN1, N9, N13, N17, N18, N21. The same team covers Ponders End (1 mile), Tottenham (2 miles), Enfield (2 miles), Palmers Green (2 miles), all within easy reach.
Just over the Essex border, Waltham Abbey is about 5 miles away. In London, space is at a premium and gardens are often short, so side returns, wraparounds and carefully planned rear extensions tend to make the most of every metre.
Is a double-storey extension right for your house?
- Houses with enough distance to the rear or side boundary
- Growing families who need a bedroom as well as a bigger kitchen
- Homeowners who would otherwise consider moving
Will the council need to approve it?
In England a two-storey rear extension is permitted development only if it projects no more than 3 m from the original rear wall, sits at least 7 m from the rear boundary, matches the roof pitch and uses obscure, non-opening side windows upstairs. Most two-storey extensions therefore go through a householder planning application, which costs £548 from 1 April 2026 and normally takes about 8 weeks.
Homes in conservation areas, national parks, National Landscapes (formerly AONBs), the Broads and World Heritage Sites have tighter rules, so we always check the property's status and planning history before design starts.
Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.
Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.
Applications are decided by the local planning authority (your district, borough or unitary council).
From first visit to completion
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
First, a site visit: we look at the house, garden, access and drains and listen to what you need.
Design and approvals
We produce the drawings and structural design, and manage the approvals so they are in place before work starts.
Fixed written price
The price is fixed in writing once the design is settled, with a clear programme and payment stages.
Build and sign-off
Work is carried out to the agreed programme, inspected by building control and signed off at the end.
Double-storey extension questions answered
Will my neighbours in Edmonton be involved?
If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.
Do I need building regulations approval in Edmonton?
Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.
How long does a double-storey extension take to build in Edmonton?
On site, typically 16 to 24 weeks once approvals are in place. Before that, allow 8–16 weeks design and approvals.
Do I need a Party Wall Agreement?
If you are in England or Wales and the work involves a shared wall or digging foundations close to a neighbour, the Party Wall etc. Act 1996 applies and notices must be served before work starts. We tell you which notices are needed.
Is a two-storey extension cheaper per square metre?
Usually. Our guide range is about £2,020 to £3,900 per m² of new floor area including VAT, compared with £2,280 to £4,420 per m² for single-storey work, because the foundations and roof are shared across two floors.
Book a free site visit in Edmonton
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.