house-extension.uk

Double-storey extensions in Chalfont St Peter: design, approvals and build

If you live in Chalfont St Peter and want more space without moving, a double-storey extension is one of the most practical ways to get it. We handle the drawings, approvals and the build.

  • Guide price in Chalfont St PeterFrom £42,500 inc VAT
  • PlanningUsually a householder application
  • Build time16–24 weeks on site
  • Postcode districtsSL9
Two-storey rear extension on a brick semi-detached house with a hipped roof

What is included

  • Householder planning application where needed
  • Ground and first floor structure, roof tied into the existing roof
  • Building regulations drawings and structural design
  • Foundations sized for two floors

Working in Chalfont St Peter

Postcode districts we cover around Chalfont St Peter include SL9. Nearby, we also take on projects in Gerrards Cross (2 miles), Amersham (5 miles), Chesham (7 miles), High Wycombe (8 miles).

Just over the Hertfordshire border, Rickmansworth is about 4 miles away. Homes across the South East range from Victorian terraces in the older town centres to large detached houses on the edges, so the right extension type varies street by street.

Guide prices for Chalfont St Peter

Prices below are for Chalfont St Peter, using the South East England factor of ×1.12. They are guide ranges including VAT for the build only, not a quote.

Typical rates in Chalfont St Peter: £1,740 to £3,360 per m² including VAT, depending on specification.

SizeEssentialStandardPremium
3 m × 4 m, two floors
24 m²
£42,500 – £51,000£48,000 – £63,500£61,500 – £81,000
4 m × 4 m, two floors
32 m²
£55,500 – £66,500£64,500 – £84,500£82,000 – £108,000
4 m × 6 m, two floors
48 m²
£83,000 – £99,500£96,500 – £126,500£123,500 – £161,500

For a figure based on your own dimensions, use our guide-price tool.

Will the council need to approve it?

In England a two-storey rear extension is permitted development only if it projects no more than 3 m from the original rear wall, sits at least 7 m from the rear boundary, matches the roof pitch and uses obscure, non-opening side windows upstairs. Most two-storey extensions therefore go through a householder planning application, which costs £548 from 1 April 2026 and normally takes about 8 weeks.

The planning position for a specific Chalfont St Peter address depends on its history and any designations, which is why we check it at the first visit.

Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.

Applications are decided by the local planning authority (your district, borough or unitary council).

From first visit to completion

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    First, a site visit: we look at the house, garden, access and drains and listen to what you need.

  2. Design and approvals

    Once the layout is agreed, we deal with the council: planning permission or written confirmation that none is needed, plus building control.

  3. Fixed written price

    With the design and specification agreed, you get a fixed written price and a start date.

  4. Build and sign-off

    Our team builds the extension, keeps you updated weekly and finishes with building control sign-off.

Common questions in Chalfont St Peter

Will my neighbours in Chalfont St Peter be involved?

If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.

Do I need building regulations approval in Chalfont St Peter?

Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.

How long does a double-storey extension take to build in Chalfont St Peter?

On site, typically 16 to 24 weeks once approvals are in place. Before that, allow 8–16 weeks design and approvals.

Do I need a Party Wall Agreement?

If you are in England or Wales and the work involves a shared wall or digging foundations close to a neighbour, the Party Wall etc. Act 1996 applies and notices must be served before work starts. We tell you which notices are needed.

Does a double-storey extension need planning permission?

Often, yes. In England a two-storey rear extension can be permitted development only if it projects no more than 3 m and sits at least 7 m from the rear boundary, with matching roof pitch and obscure side windows. Side extensions over one storey always need planning permission. We confirm the route at the survey.

Book a free site visit in Chalfont St Peter

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote