Double-storey extensions in Caterham
A double-storey extension in Caterham starts with the right design and the right approval route. We take care of both, then build it with our own project management.
- Guide price in CaterhamFrom £42,500 inc VAT
- PlanningUsually a householder application
- Build time16–24 weeks on site
- Postcode districtsCR3

Local to Caterham
Across CR3, we can visit, measure and advise. The same team covers Redhill (5 miles), Banstead (6 miles), Reigate (6 miles), Horley (8 miles), all within easy reach.
The South East has a broad mix of 1930s semis, post-war estates, newer developments and period cottages, and many houses have enough garden for a generous rear extension.
Guide prices for Caterham
Labour and material costs vary across the UK, so for Caterham we use our South East England factor (×1.12). The ranges include VAT and exclude design, structural and council fees.
Typical rates in Caterham: £1,740 to £3,360 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| 3 m × 4 m, two floors 24 m² | £42,500 – £51,000 | £48,000 – £63,500 | £61,500 – £81,000 |
| 4 m × 4 m, two floors 32 m² | £55,500 – £66,500 | £64,500 – £84,500 | £82,000 – £108,000 |
| 4 m × 6 m, two floors 48 m² | £83,000 – £99,500 | £96,500 – £126,500 | £123,500 – £161,500 |
Want a range for your exact size? The guide-price tool takes about a minute.
What is included
- Measured survey, design and planning drawings
- Householder planning application where needed
- Building regulations drawings and structural design
- Foundations sized for two floors
- Breaking through at both levels, stairs and landing changes where needed
Planning and approvals in Caterham
In England a two-storey rear extension is permitted development only if it projects no more than 3 m from the original rear wall, sits at least 7 m from the rear boundary, matches the roof pitch and uses obscure, non-opening side windows upstairs. Most two-storey extensions therefore go through a householder planning application, which costs £548 from 1 April 2026 and normally takes about 8 weeks.
Homes in conservation areas, national parks, National Landscapes (formerly AONBs), the Broads and World Heritage Sites have tighter rules, so we always check the property's status and planning history before design starts.
Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.
If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.
Applications are decided by the local planning authority (your district, borough or unitary council).
Our process, step by step
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
First, a site visit: we look at the house, garden, access and drains and listen to what you need.
Design and approvals
Drawings are prepared and agreed with you, then submitted for the right planning route and building regulations approval.
Fixed written price
You receive a written, itemised price and programme. Nothing starts until you are happy with it.
Build and sign-off
Our team builds the extension, keeps you updated weekly and finishes with building control sign-off.
Double-storey extension questions answered
Who do I contract with for a double-storey extension in Caterham?
Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.
Can I see a price before committing to anything?
Yes. The guide prices on this page are adjusted for Caterham, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.
How long does a double-storey extension take to build in Caterham?
On site, typically 16 to 24 weeks once approvals are in place. Before that, allow 8–16 weeks design and approvals.
Does a double-storey extension need planning permission?
Often, yes. In England a two-storey rear extension can be permitted development only if it projects no more than 3 m and sits at least 7 m from the rear boundary, with matching roof pitch and obscure side windows. Side extensions over one storey always need planning permission. We confirm the route at the survey.
Do I need a Party Wall Agreement?
If you are in England or Wales and the work involves a shared wall or digging foundations close to a neighbour, the Party Wall etc. Act 1996 applies and notices must be served before work starts. We tell you which notices are needed.
Book a free site visit in Caterham
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.