house-extension.uk

Battersea double-storey extensions, designed and built

A double-storey extension in Battersea starts with the right design and the right approval route. We take care of both, then build it with our own project management.

  • Guide price in BatterseaFrom £49,000 inc VAT
  • PlanningUsually a householder application
  • Build time16–24 weeks on site
  • Postcode districtsSW1W, SW3, SW4, SW8, SW10
Two-storey rear extension on a brick semi-detached house with a hipped roof

Is a double-storey extension right for your house?

  • Homeowners who would otherwise consider moving
  • Houses with enough distance to the rear or side boundary
  • Growing families who need a bedroom as well as a bigger kitchen

The roof is what makes a two-storey extension look right or wrong. We match the pitch and materials of the main house wherever possible and plan the upstairs layout around the existing landing so the new rooms feel original rather than bolted on.

Working in Battersea

Site visits are available across Battersea (SW1W, SW3, SW4, SW8, SW10, SW11). Neighbouring towns we cover include Chelsea (1 mile), Fulham (2 miles), Brixton (2 miles), Earlsfield (2 miles).

Just over the Surrey border, Ewell is about 10 miles away. Across London, terraced houses with narrow side returns and tight access are the norm, which shapes everything from party wall notices to how materials reach the back garden.

What should I budget for a double-storey extension in Battersea?

Prices below are for Battersea, using the London factor of ×1.3. They are guide ranges including VAT for the build only, not a quote.

Typical rates in Battersea: £2,020 to £3,900 per m² including VAT, depending on specification.

SizeEssentialStandardPremium
3 m × 4 m, two floors
24 m²
£49,000 – £59,000£56,000 – £73,500£71,500 – £94,000
4 m × 4 m, two floors
32 m²
£64,000 – £77,000£74,500 – £98,000£95,500 – £125,000
4 m × 6 m, two floors
48 m²
£96,500 – £115,500£112,000 – £147,000£143,500 – £187,500

Want a range for your exact size? The guide-price tool takes about a minute.

Planning and approvals in Battersea

In England a two-storey rear extension is permitted development only if it projects no more than 3 m from the original rear wall, sits at least 7 m from the rear boundary, matches the roof pitch and uses obscure, non-opening side windows upstairs. Most two-storey extensions therefore go through a householder planning application, which costs £548 from 1 April 2026 and normally takes about 8 weeks.

In a conservation area, national park, National Landscape, the Broads or a World Heritage Site the permitted development limits are tighter (no side or two-storey extensions without an application). Listed homes need listed building consent, and if permitted development rights have been removed, any extension needs an application.

Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.

Applications are decided by the local planning authority (your district, borough or unitary council).

How the project works

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    A designer visits, takes measurements and photos, and discusses layouts, budget and timing with you.

  2. Design and approvals

    Drawings are prepared and agreed with you, then submitted for the right planning route and building regulations approval.

  3. Fixed written price

    The price is fixed in writing once the design is settled, with a clear programme and payment stages.

  4. Build and sign-off

    Our team builds the extension, keeps you updated weekly and finishes with building control sign-off.

Your questions about a double-storey extension in Battersea

Do I need building regulations approval in Battersea?

Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.

How long does a double-storey extension take to build in Battersea?

On site, typically 16 to 24 weeks once approvals are in place. Before that, allow 8–16 weeks design and approvals.

Can I see a price before committing to anything?

Yes. The guide prices on this page are adjusted for Battersea, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.

Do I need a Party Wall Agreement?

If you are in England or Wales and the work involves a shared wall or digging foundations close to a neighbour, the Party Wall etc. Act 1996 applies and notices must be served before work starts. We tell you which notices are needed.

Does a double-storey extension need planning permission?

Often, yes. In England a two-storey rear extension can be permitted development only if it projects no more than 3 m and sits at least 7 m from the rear boundary, with matching roof pitch and obscure side windows. Side extensions over one storey always need planning permission. We confirm the route at the survey.

Book a free site visit in Battersea

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote