Double-storey extensions across Bath

We design and build double-storey extensions for houses in Bath, with a written price once the survey and design are done and one point of contact throughout.

  • Guide price in BathFrom £38,500 inc VAT
  • PlanningUsually a householder application
  • Build time16–24 weeks on site
  • Postcode districtsBA1, BA2
Two-storey rear extension on a brick semi-detached house with a hipped roof

Is a double-storey extension right for your house?

  • Houses with enough distance to the rear or side boundary
  • Homeowners who would otherwise consider moving
  • Growing families who need a bedroom as well as a bigger kitchen

The roof is what makes a two-storey extension look right or wrong. We match the pitch and materials of the main house wherever possible and plan the upstairs layout around the existing landing so the new rooms feel original rather than bolted on.

Extensions in and around Bath

Across BA1, BA2, we can visit, measure and advise. The same team covers Keynsham (6 miles), Frome (10 miles), Nailsea (18 miles), Portishead (19 miles), all within easy reach.

South West homes range from terraced streets in the cities to stone cottages and bungalows in the countryside, and conservation areas are common in historic centres.

Planning rules that apply in Bath

In England a two-storey rear extension is permitted development only if it projects no more than 3 m from the original rear wall, sits at least 7 m from the rear boundary, matches the roof pitch and uses obscure, non-opening side windows upstairs. Most two-storey extensions therefore go through a householder planning application, which costs £548 from 1 April 2026 and normally takes about 8 weeks.

Before any drawing is finalised we check whether the house is listed, in a conservation area or subject to an Article 4 direction.

Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.

Applications are decided by the local planning authority (your district, borough or unitary council).

What should I budget for a double-storey extension in Bath?

Labour and material costs vary across the UK, so for Bath we use our South West England factor (×1.02). The ranges include VAT and exclude design, structural and council fees.

Typical rates in Bath: £1,580 to £3,060 per m² including VAT, depending on specification.

SizeEssentialStandardPremium
3 m × 4 m, two floors
24 m²
£38,500 – £46,500£44,000 – £58,000£56,000 – £73,500
4 m × 4 m, two floors
32 m²
£50,500 – £60,500£58,500 – £77,000£75,000 – £98,000
4 m × 6 m, two floors
48 m²
£75,500 – £91,000£88,000 – £115,500£112,500 – £147,000

For a figure based on your own dimensions, use our guide-price tool.

Our process, step by step

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    It starts with a visit to your house to measure, check access and talk through ideas and budget.

  2. Design and approvals

    We draw the design, agree it with you and handle planning or permitted development checks and building regulations.

  3. Fixed written price

    With the design and specification agreed, you get a fixed written price and a start date.

  4. Build and sign-off

    The build is managed from start to finish, inspected at each stage and signed off on completion.

Your questions about a double-storey extension in Bath

How long does a double-storey extension take to build in Bath?

On site, typically 16 to 24 weeks once approvals are in place. Before that, allow 8–16 weeks design and approvals.

Do I need building regulations approval in Bath?

Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.

Do you cover all of Bath?

Yes. We cover Bath and the surrounding parts of Somerset. Site visits are free and there is no obligation.

Does a double-storey extension need planning permission?

Often, yes. In England a two-storey rear extension can be permitted development only if it projects no more than 3 m and sits at least 7 m from the rear boundary, with matching roof pitch and obscure side windows. Side extensions over one storey always need planning permission. We confirm the route at the survey.

Do I need a Party Wall Agreement?

If you are in England or Wales and the work involves a shared wall or digging foundations close to a neighbour, the Party Wall etc. Act 1996 applies and notices must be served before work starts. We tell you which notices are needed.

Book a free site visit in Bath

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote