Double-storey extensions for homes in Barnet
Our design and build teams take on double-storey extensions in Barnet, from the first measured survey through planning and building control to the finished room.
- Guide price in BarnetFrom £49,000 inc VAT
- PlanningUsually a householder application
- Build time16–24 weeks on site
- Postcode districtsEN4, EN5, N20

What we take care of
- Insulation, plastering, electrics and plumbing to finish
- Ground and first floor structure, roof tied into the existing roof
- Breaking through at both levels, stairs and landing changes where needed
- Building regulations drawings and structural design
- Foundations sized for two floors
The roof is what makes a two-storey extension look right or wrong. We match the pitch and materials of the main house wherever possible and plan the upstairs layout around the existing landing so the new rooms feel original rather than bolted on.
Working in Barnet
We cover Barnet and the postcode districts EN4, EN5, N20. Neighbouring towns we cover include East Barnet (2 miles), Friern Barnet (3 miles), Finchley (3 miles), Palmers Green (4 miles).
Potters Bar, in Hertfordshire, is roughly 3 miles from Barnet and also on our list. London's housing is dominated by Victorian and Edwardian terraces, many with a rear outrigger and a side return, and 1930s semis in the outer boroughs. Conservation areas are common, so the planning check comes first.
Will the council need to approve it?
In England a two-storey rear extension is permitted development only if it projects no more than 3 m from the original rear wall, sits at least 7 m from the rear boundary, matches the roof pitch and uses obscure, non-opening side windows upstairs. Most two-storey extensions therefore go through a householder planning application, which costs £548 from 1 April 2026 and normally takes about 8 weeks.
In a conservation area, national park, National Landscape, the Broads or a World Heritage Site the permitted development limits are tighter (no side or two-storey extensions without an application). Listed homes need listed building consent, and if permitted development rights have been removed, any extension needs an application.
Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.
If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.
Applications are decided by the local planning authority (your district, borough or unitary council).
How much does a double-storey extension cost in Barnet?
Labour and material costs vary across the UK, so for Barnet we use our London factor (×1.3). The ranges include VAT and exclude design, structural and council fees.
Typical rates in Barnet: £2,020 to £3,900 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| 3 m × 4 m, two floors 24 m² | £49,000 – £59,000 | £56,000 – £73,500 | £71,500 – £94,000 |
| 4 m × 4 m, two floors 32 m² | £64,000 – £77,000 | £74,500 – £98,000 | £95,500 – £125,000 |
| 4 m × 6 m, two floors 48 m² | £96,500 – £115,500 | £112,000 – £147,000 | £143,500 – £187,500 |
Want a range for your exact size? The guide-price tool takes about a minute.
Our process, step by step
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
A designer visits, takes measurements and photos, and discusses layouts, budget and timing with you.
Design and approvals
We produce the drawings and structural design, and manage the approvals so they are in place before work starts.
Fixed written price
You receive a written, itemised price and programme. Nothing starts until you are happy with it.
Build and sign-off
The build is managed from start to finish, inspected at each stage and signed off on completion.
Common questions in Barnet
Who do I contract with for a double-storey extension in Barnet?
Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.
Do I need building regulations approval in Barnet?
Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.
Can I see a price before committing to anything?
Yes. The guide prices on this page are adjusted for Barnet, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.
Does a double-storey extension need planning permission?
Often, yes. In England a two-storey rear extension can be permitted development only if it projects no more than 3 m and sits at least 7 m from the rear boundary, with matching roof pitch and obscure side windows. Side extensions over one storey always need planning permission. We confirm the route at the survey.
Is a two-storey extension cheaper per square metre?
Usually. Our guide range is about £2,020 to £3,900 per m² of new floor area including VAT, compared with £2,280 to £4,420 per m² for single-storey work, because the foundations and roof are shared across two floors.
Book a free site visit in Barnet
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.