Conservatory replacement extensions for homes in Wealdstone
If you live in Wealdstone and want more space without moving, a conservatory replacement is one of the most practical ways to get it. We handle the drawings, approvals and the build.
- Guide price in WealdstoneFrom £26,000 inc VAT
- PlanningOften permitted development (3–4 m), or prior approval up to 6–8 m
- Build time8–14 weeks on site
- Postcode districtsHA1, HA3, HA7

Guide prices for Wealdstone
For Wealdstone we adjust our national guide rates by ×1.3, the factor we use for London. Figures include VAT; your written quote after the survey replaces them.
Typical rates in Wealdstone: £2,400 to £4,550 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| 3 m × 3.3 m 10 m² | £26,000 – £31,000 | £27,500 – £36,000 | £35,500 – £45,500 |
| 3.5 m × 4 m 14 m² | £33,500 – £40,500 | £39,000 – £50,500 | £50,000 – £64,000 |
| 4 m × 5 m 20 m² | £48,000 – £57,500 | £55,500 – £71,500 | £71,500 – £91,000 |
Includes removal of the old conservatory. Reusing existing foundations is only possible after investigation.
Want a range for your exact size? The guide-price tool takes about a minute.
Extensions in and around Wealdstone
We cover Wealdstone and the postcode districts HA1, HA3, HA7. Nearby, we also take on projects in Harrow (1 mile), Pinner (2 miles), Wembley (4 miles), Northolt (4 miles).
For homes towards Hertfordshire, Bushey is around 3 miles away. In London, space is at a premium and gardens are often short, so side returns, wraparounds and carefully planned rear extensions tend to make the most of every metre.
When a conservatory replacement makes sense
- Conservatories that are too hot or too cold
- Older uPVC conservatories near the end of their life
- Homes where the conservatory sits unused
Do I need planning permission in Wealdstone?
In England a single-storey rear extension can usually go up to 3 m beyond the original rear wall of a semi-detached or terraced house, or 4 m on a detached house, without a planning application, provided it is no more than 4 m high, keeps eaves to 3 m within 2 m of a boundary and, with other buildings, covers no more than half the land around the original house. The larger home extension prior approval scheme raises those depths to 6 m and 8 m, with neighbours notified and a 42-day decision.
In a conservation area, national park, National Landscape, the Broads or a World Heritage Site the permitted development limits are tighter (no side or two-storey extensions without an application). Listed homes need listed building consent, and if permitted development rights have been removed, any extension needs an application.
Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.
Applications are decided by the local planning authority (your district, borough or unitary council).
From first visit to completion
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
It starts with a visit to your house to measure, check access and talk through ideas and budget.
Design and approvals
Once the layout is agreed, we deal with the council: planning permission or written confirmation that none is needed, plus building control.
Fixed written price
The price is fixed in writing once the design is settled, with a clear programme and payment stages.
Build and sign-off
The build is managed from start to finish, inspected at each stage and signed off on completion.
Common questions in Wealdstone
Will my neighbours in Wealdstone be involved?
If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.
How long does a conservatory replacement take to build in Wealdstone?
On site, typically 8 to 14 weeks once approvals are in place. Before that, allow 4–12 weeks design and approvals.
Can I see a price before committing to anything?
Yes. The guide prices on this page are adjusted for Wealdstone, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.
Does replacing a conservatory need planning permission?
A solid replacement is treated as a new extension, so it must meet the permitted development limits or get planning permission, and it always needs building regulations approval.
Can I keep the existing base?
Sometimes, but conservatory bases are often too shallow for solid walls. Trial holes tell us before we confirm the price.
Book a free site visit in Wealdstone
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.