house-extension.uk

Conservatory replacement extensions for homes in Tyne and Wear

A conservatory replacement in Tyne and Wear starts with the right design and the right approval route. We take care of both, then build it with our own project management.

  • Guide priceFrom £18,000 inc VAT
  • PlanningOften permitted development (3–4 m), or prior approval up to 6–8 m
  • Towns covered15
  • Site visitFree, no obligation
Solid extension with a tiled roof that replaced a conservatory

What should I budget for a conservatory replacement in Tyne and Wear?

For Tyne and Wear we adjust our national guide rates by ×0.91, the factor we use for North East England. Figures include VAT; your written quote after the survey replaces them.

Typical rates in Tyne and Wear: £1,680 to £3,180 per m² including VAT, depending on specification.

SizeEssentialStandardPremium
3 m × 3.3 m
10 m²
£18,000 – £22,000£19,500 – £25,500£25,000 – £32,000
3.5 m × 4 m
14 m²
£23,500 – £28,500£27,000 – £35,500£35,000 – £45,000
4 m × 5 m
20 m²
£33,500 – £40,500£39,000 – £50,500£50,000 – £64,000

Includes removal of the old conservatory. Reusing existing foundations is only possible after investigation.

Try the guide-price tool to see a range for your own size and finish.

Extensions in and around Tyne and Wear

Towns we cover in Tyne and Wear include Newcastle upon Tyne, Sunderland, South Shields, Gateshead, Washington, Tynemouth, Wallsend, Newburn. Across the North East, houses often have rear yards or modest gardens, so compact, well-lit single-storey extensions make the biggest difference.

Will the council need to approve it?

In England a single-storey rear extension can usually go up to 3 m beyond the original rear wall of a semi-detached or terraced house, or 4 m on a detached house, without a planning application, provided it is no more than 4 m high, keeps eaves to 3 m within 2 m of a boundary and, with other buildings, covers no more than half the land around the original house. The larger home extension prior approval scheme raises those depths to 6 m and 8 m, with neighbours notified and a 42-day decision.

Homes in conservation areas, national parks, National Landscapes (formerly AONBs), the Broads and World Heritage Sites have tighter rules, so we always check the property's status and planning history before design starts.

Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.

Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.

Applications are decided by the local planning authority (your district, borough or unitary council).

What is included

  • New or upgraded foundations
  • Removal and disposal of the old conservatory
  • Opening widened into the house if wanted
  • Insulated walls and roof to current regulations

A replacement is a chance to rethink the shape. Many conservatories are oddly proportioned; for a similar cost the new room can often be squarer, wider or better connected to the kitchen.

Our process, step by step

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    It starts with a visit to your house to measure, check access and talk through ideas and budget.

  2. Design and approvals

    Drawings are prepared and agreed with you, then submitted for the right planning route and building regulations approval.

  3. Fixed written price

    The price is fixed in writing once the design is settled, with a clear programme and payment stages.

  4. Build and sign-off

    Work is carried out to the agreed programme, inspected by building control and signed off at the end.

Common questions in Tyne and Wear

Will my neighbours in Tyne and Wear be involved?

If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.

Do I need building regulations approval in Tyne and Wear?

Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.

How long does a conservatory replacement take to build in Tyne and Wear?

On site, typically 8 to 14 weeks once approvals are in place. Before that, allow 4–12 weeks design and approvals.

Does replacing a conservatory need planning permission?

A solid replacement is treated as a new extension, so it must meet the permitted development limits or get planning permission, and it always needs building regulations approval.

Can I keep the existing base?

Sometimes, but conservatory bases are often too shallow for solid walls. Trial holes tell us before we confirm the price.

Book a free site visit in Tyne and Wear

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote