house-extension.uk

Conservatory replacement extensions across Stockport

A conservatory replacement in Stockport starts with the right design and the right approval route. We take care of both, then build it with our own project management.

  • Guide price in StockportFrom £19,000 inc VAT
  • PlanningOften permitted development (3–4 m), or prior approval up to 6–8 m
  • Build time8–14 weeks on site
  • Postcode districtsM19, SK1, SK2, SK3, SK4
Solid extension with a tiled roof that replaced a conservatory

Guide prices for Stockport

Prices below are for Stockport, using the North West England factor of ×0.95. They are guide ranges including VAT for the build only, not a quote.

Typical rates in Stockport: £1,760 to £3,320 per m² including VAT, depending on specification.

SizeEssentialStandardPremium
3 m × 3.3 m
10 m²
£19,000 – £23,000£20,000 – £26,500£26,000 – £33,500
3.5 m × 4 m
14 m²
£24,500 – £29,500£28,500 – £37,000£36,500 – £47,000
4 m × 5 m
20 m²
£35,000 – £42,000£40,500 – £52,500£52,000 – £66,500

Includes removal of the old conservatory. Reusing existing foundations is only possible after investigation.

Try the guide-price tool to see a range for your own size and finish.

Do I need planning permission in Stockport?

In England a single-storey rear extension can usually go up to 3 m beyond the original rear wall of a semi-detached or terraced house, or 4 m on a detached house, without a planning application, provided it is no more than 4 m high, keeps eaves to 3 m within 2 m of a boundary and, with other buildings, covers no more than half the land around the original house. The larger home extension prior approval scheme raises those depths to 6 m and 8 m, with neighbours notified and a 42-day decision.

In a conservation area, national park, National Landscape, the Broads or a World Heritage Site the permitted development limits are tighter (no side or two-storey extensions without an application). Listed homes need listed building consent, and if permitted development rights have been removed, any extension needs an application.

Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.

Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.

Applications are decided by the local planning authority (your district, borough or unitary council).

Included in a typical project

  • Insulated walls and roof to current regulations
  • Trial holes to check the existing foundations
  • Opening widened into the house if wanted
  • Glazing and doors to suit the new room
  • Removal and disposal of the old conservatory

Working in Stockport

Postcode districts we cover around Stockport include M19, SK1, SK2, SK3, SK4, SK5. We also work in nearby Hazel Grove (2 miles), Cheadle Hulme (3 miles), Denton (4 miles), Hyde (4 miles).

Wilmslow, in Cheshire, is roughly 6 miles from Stockport and also on our list. Across the North West, terraced houses with small rear yards suit compact rear and side return extensions, while suburban semis have room for more.

What happens next

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    We visit your Stockport home, measure up, talk through what you want and check the planning position.

  2. Design and approvals

    Once the layout is agreed, we deal with the council: planning permission or written confirmation that none is needed, plus building control.

  3. Fixed written price

    With the design and specification agreed, you get a fixed written price and a start date.

  4. Build and sign-off

    Work is carried out to the agreed programme, inspected by building control and signed off at the end.

Conservatory replacement questions answered

Do you cover all of Stockport?

Yes. We cover Stockport and the surrounding parts of Greater Manchester. Site visits are free and there is no obligation.

Do I need building regulations approval in Stockport?

Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.

Will my neighbours in Stockport be involved?

If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.

Does replacing a conservatory need planning permission?

A solid replacement is treated as a new extension, so it must meet the permitted development limits or get planning permission, and it always needs building regulations approval.

Can I keep the existing base?

Sometimes, but conservatory bases are often too shallow for solid walls. Trial holes tell us before we confirm the price.

Book a free site visit in Stockport

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote