Bungalow extensions across Woking
Planning a bungalow extension in Woking? We survey the house, work out the planning route, draw the design and build it, so you deal with one team from the first visit to the completion certificate.
- Guide price in WokingFrom £29,000 inc VAT
- PlanningSingle storey often permitted development
- Build time10–18 weeks on site
- Postcode districtsGU21, GU22, GU23, GU24, KT14

What is included
- Structural survey before any upward extension
- Roof designs that tie into the existing hipped or gable roof
- Single-storey extension options assessed first
- Level thresholds and accessible layouts
- Planning application where needed
Guide prices for Woking
For Woking we adjust our national guide rates by ×1.12, the factor we use for South East England. Figures include VAT; your written quote after the survey replaces them.
Typical rates in Woking: £1,960 to £3,810 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| 3 m × 5 m 15 m² | £29,000 – £35,500 | £34,000 – £45,000 | £43,500 – £57,500 |
| 4 m × 6 m 24 m² | £47,000 – £56,500 | £55,000 – £71,500 | £69,500 – £91,500 |
| L-shape 35 m² | £68,500 – £82,500 | £80,000 – £104,000 | £101,500 – £133,500 |
Want a range for your exact size? The guide-price tool takes about a minute.
Local to Woking
Site visits are available across Woking (GU21, GU22, GU23, GU24, KT14, KT15). We also work in nearby Weybridge (6 miles), Guildford (6 miles), Egham (8 miles), Walton-on-Thames (8 miles).
Homes across the South East range from Victorian terraces in the older town centres to large detached houses on the edges, so the right extension type varies street by street.
Will the council need to approve it?
In England a single-storey extension to a bungalow follows the normal permitted development limits (3 m or 4 m, or 6 m and 8 m through prior approval). Adding a first floor always needs planning permission.
Before any drawing is finalised we check whether the house is listed, in a conservation area or subject to an Article 4 direction.
If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.
Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.
Applications are decided by the local planning authority (your district, borough or unitary council).
Our process, step by step
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
First, a site visit: we look at the house, garden, access and drains and listen to what you need.
Design and approvals
Once the layout is agreed, we deal with the council: planning permission or written confirmation that none is needed, plus building control.
Fixed written price
You receive a written, itemised price and programme. Nothing starts until you are happy with it.
Build and sign-off
The build is managed from start to finish, inspected at each stage and signed off on completion.
Your questions about a bungalow extension in Woking
Do you cover all of Woking?
Yes. We cover Woking and the surrounding parts of Surrey. Site visits are free and there is no obligation.
Will my neighbours in Woking be involved?
If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.
Do I need building regulations approval in Woking?
Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.
Is it better to extend sideways or upwards?
Sideways and rearwards is usually simpler, cheaper and keeps single-level living. Upwards saves garden but means stairs, more structure and planning permission.
Can I extend a bungalow without planning permission?
In England a single-storey rear extension to a bungalow follows the same permitted development limits as a house: 3 m or 4 m, or up to 6 m or 8 m through prior approval. Adding a storey always needs planning permission.
Book a free site visit in Woking
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.