Warwick bungalow extensions, designed and built
Warwick homeowners can use us for the whole bungalow extension project: survey, design, planning or permitted development checks, building regulations and the build itself.
- Guide price in WarwickFrom £25,000 inc VAT
- PlanningSingle storey often permitted development
- Build time10–18 weeks on site
- Postcode districtsCV31, CV32, CV34

Guide prices for Warwick
For Warwick we adjust our national guide rates by ×0.97, the factor we use for West Midlands. Figures include VAT; your written quote after the survey replaces them.
Typical rates in Warwick: £1,700 to £3,300 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| 3 m × 5 m 15 m² | £25,000 – £31,000 | £29,500 – £39,000 | £37,500 – £49,500 |
| 4 m × 6 m 24 m² | £40,500 – £49,000 | £47,500 – £62,000 | £60,500 – £79,500 |
| L-shape 35 m² | £59,000 – £71,500 | £69,500 – £90,000 | £88,000 – £115,500 |
Want a range for your exact size? The guide-price tool takes about a minute.
What is included
- Roof designs that tie into the existing hipped or gable roof
- Level thresholds and accessible layouts
- Structural survey before any upward extension
- Planning application where needed
- Single-storey extension options assessed first
Bungalow roofs are often hipped, which makes tying in an extension roof a careful job. We draw the roof junction early because it drives both the look and the cost.
Covering Warwick
We cover Warwick and the postcode districts CV31, CV32, CV34. Neighbouring towns we cover include Leamington Spa (3 miles), Kenilworth (5 miles), Stratford-upon-Avon (8 miles), Bedworth (14 miles).
For homes towards West Midlands, Coventry is around 9 miles away. The West Midlands has a large stock of 1930s and post-war semi-detached houses, which are well suited to rear, side and over-garage extensions, plus Victorian terraces in the older inner areas.
Do I need planning permission in Warwick?
In England a single-storey extension to a bungalow follows the normal permitted development limits (3 m or 4 m, or 6 m and 8 m through prior approval). Adding a first floor always needs planning permission.
Homes in conservation areas, national parks, National Landscapes (formerly AONBs), the Broads and World Heritage Sites have tighter rules, so we always check the property's status and planning history before design starts.
If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.
Applications are decided by the local planning authority (your district, borough or unitary council).
How the project works
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
It starts with a visit to your house to measure, check access and talk through ideas and budget.
Design and approvals
We produce the drawings and structural design, and manage the approvals so they are in place before work starts.
Fixed written price
With the design and specification agreed, you get a fixed written price and a start date.
Build and sign-off
We build it with one project manager, book the building control inspections and hand over the completion certificate.
Questions people ask about bungalow extensions
Do I need building regulations approval in Warwick?
Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.
Will my neighbours in Warwick be involved?
If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.
Who do I contract with for a bungalow extension in Warwick?
Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.
Can I extend a bungalow without planning permission?
In England a single-storey rear extension to a bungalow follows the same permitted development limits as a house: 3 m or 4 m, or up to 6 m or 8 m through prior approval. Adding a storey always needs planning permission.
How much does a bungalow extension cost?
Our guide range for single-storey work is about £1,700 to £3,300 per m² including VAT. Going upwards is priced after a structural survey.
Book a free site visit in Warwick
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.