Bungalow extensions for homes in Stratford
Our design and build teams take on bungalow extensions in Stratford, from the first measured survey through planning and building control to the finished room.
- Guide price in StratfordFrom £34,000 inc VAT
- PlanningSingle storey often permitted development
- Build time10–18 weeks on site
- Postcode districtsE3, E7, E9, E13, E15

Guide prices for Stratford
These guide figures apply our London adjustment (×1.3) to national rates. They include VAT at 20% and cover the build itself; design and council fees are listed separately.
Typical rates in Stratford: £2,280 to £4,420 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| 3 m × 5 m 15 m² | £34,000 – £41,000 | £39,500 – £52,000 | £50,500 – £66,500 |
| 4 m × 6 m 24 m² | £54,500 – £66,000 | £63,500 – £83,000 | £81,000 – £106,500 |
| L-shape 35 m² | £79,500 – £96,000 | £93,000 – £121,000 | £118,000 – £155,000 |
For a figure based on your own dimensions, use our guide-price tool.
Working in Stratford
Our survey diary covers Stratford, including E3, E7, E9, E13, E15, E16. Nearby, we also take on projects in West Ham (1 mile), Bow (1 mile), Canning Town (2 miles), Stepney (2 miles).
In London, space is at a premium and gardens are often short, so side returns, wraparounds and carefully planned rear extensions tend to make the most of every metre.
Do I need planning permission in Stratford?
In England a single-storey extension to a bungalow follows the normal permitted development limits (3 m or 4 m, or 6 m and 8 m through prior approval). Adding a first floor always needs planning permission.
In a conservation area, national park, National Landscape, the Broads or a World Heritage Site the permitted development limits are tighter (no side or two-storey extensions without an application). Listed homes need listed building consent, and if permitted development rights have been removed, any extension needs an application.
Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.
If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.
Applications are decided by the local planning authority (your district, borough or unitary council).
Who a bungalow extension suits
- Bungalows on larger plots
- Homeowners planning for later life
- Families wanting more space on one floor
Bungalow roofs are often hipped, which makes tying in an extension roof a careful job. We draw the roof junction early because it drives both the look and the cost.
How the project works
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
A designer visits, takes measurements and photos, and discusses layouts, budget and timing with you.
Design and approvals
Once the layout is agreed, we deal with the council: planning permission or written confirmation that none is needed, plus building control.
Fixed written price
The price is fixed in writing once the design is settled, with a clear programme and payment stages.
Build and sign-off
We build it with one project manager, book the building control inspections and hand over the completion certificate.
Common questions in Stratford
How long does a bungalow extension take to build in Stratford?
On site, typically 10 to 18 weeks once approvals are in place. Before that, allow 6–14 weeks design and approvals.
Do I need building regulations approval in Stratford?
Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.
Will my neighbours in Stratford be involved?
If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.
Is it better to extend sideways or upwards?
Sideways and rearwards is usually simpler, cheaper and keeps single-level living. Upwards saves garden but means stairs, more structure and planning permission.
Can I extend a bungalow without planning permission?
In England a single-storey rear extension to a bungalow follows the same permitted development limits as a house: 3 m or 4 m, or up to 6 m or 8 m through prior approval. Adding a storey always needs planning permission.
Book a free site visit in Stratford
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .