Preston bungalow extensions, designed and built
We design and build bungalow extensions for houses in Preston, with a written price once the survey and design are done and one point of contact throughout.
- Guide price in PrestonFrom £24,500 inc VAT
- PlanningSingle storey often permitted development
- Build time10–18 weeks on site
- Postcode districtsPR1, PR2, PR4, PR5, PR25

Working in Preston
Our survey diary covers Preston, including PR1, PR2, PR4, PR5, PR25, PR26. Nearby, we also take on projects in Leyland (5 miles), Chorley (9 miles), Blackburn (9 miles), Darwen (11 miles).
For homes towards Greater Manchester, Horwich is around 13 miles away. Across the North West, terraced houses with small rear yards suit compact rear and side return extensions, while suburban semis have room for more.
What we take care of
- Structural survey before any upward extension
- Level thresholds and accessible layouts
- Roof designs that tie into the existing hipped or gable roof
- Planning application where needed
Do I need planning permission in Preston?
In England a single-storey extension to a bungalow follows the normal permitted development limits (3 m or 4 m, or 6 m and 8 m through prior approval). Adding a first floor always needs planning permission.
In a conservation area, national park, National Landscape, the Broads or a World Heritage Site the permitted development limits are tighter (no side or two-storey extensions without an application). Listed homes need listed building consent, and if permitted development rights have been removed, any extension needs an application.
If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.
Applications are decided by the local planning authority (your district, borough or unitary council).
How much does a bungalow extension cost in Preston?
Labour and material costs vary across the UK, so for Preston we use our North West England factor (×0.95). The ranges include VAT and exclude design, structural and council fees.
Typical rates in Preston: £1,660 to £3,230 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| 3 m × 5 m 15 m² | £24,500 – £30,000 | £29,000 – £38,000 | £37,000 – £48,500 |
| 4 m × 6 m 24 m² | £39,500 – £48,000 | £46,500 – £60,500 | £59,000 – £78,000 |
| L-shape 35 m² | £58,000 – £70,000 | £68,000 – £88,500 | £86,000 – £113,500 |
Want a range for your exact size? The guide-price tool takes about a minute.
From first visit to completion
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
A designer visits, takes measurements and photos, and discusses layouts, budget and timing with you.
Design and approvals
We draw the design, agree it with you and handle planning or permitted development checks and building regulations.
Fixed written price
The price is fixed in writing once the design is settled, with a clear programme and payment stages.
Build and sign-off
Work is carried out to the agreed programme, inspected by building control and signed off at the end.
Questions people ask about bungalow extensions
How long does a bungalow extension take to build in Preston?
On site, typically 10 to 18 weeks once approvals are in place. Before that, allow 6–14 weeks design and approvals.
Will my neighbours in Preston be involved?
If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.
Do you cover all of Preston?
Yes. We cover Preston and the surrounding parts of Lancashire. Site visits are free and there is no obligation.
Is it better to extend sideways or upwards?
Sideways and rearwards is usually simpler, cheaper and keeps single-level living. Upwards saves garden but means stairs, more structure and planning permission.
Can I extend a bungalow without planning permission?
In England a single-storey rear extension to a bungalow follows the same permitted development limits as a house: 3 m or 4 m, or up to 6 m or 8 m through prior approval. Adding a storey always needs planning permission.
Book a free site visit in Preston
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end