house-extension.uk

Bungalow extensions in Pinner

From the first sketch to final sign-off, we plan and build bungalow extensions in Pinner and the surrounding Greater London area.

  • Guide price in PinnerFrom £34,000 inc VAT
  • PlanningSingle storey often permitted development
  • Build time10–18 weeks on site
  • Postcode districtsHA2, HA5
Bungalow with a rear extension in matching brick and wide glazed doors

Bungalow extension prices in Pinner

These guide figures apply our London adjustment (×1.3) to national rates. They include VAT at 20% and cover the build itself; design and council fees are listed separately.

Typical rates in Pinner: £2,280 to £4,420 per m² including VAT, depending on specification.

SizeEssentialStandardPremium
3 m × 5 m
15 m²
£34,000 – £41,000£39,500 – £52,000£50,500 – £66,500
4 m × 6 m
24 m²
£54,500 – £66,000£63,500 – £83,000£81,000 – £106,500
L-shape
35 m²
£79,500 – £96,000£93,000 – £121,000£118,000 – £155,000

Try the guide-price tool to see a range for your own size and finish.

Local to Pinner

Site visits are available across Pinner (HA2, HA5). The same team covers Wealdstone (2 miles), Ruislip (2 miles), Harrow (2 miles), South Ruislip (3 miles), all within easy reach.

In London, space is at a premium and gardens are often short, so side returns, wraparounds and carefully planned rear extensions tend to make the most of every metre.

Planning and approvals in Pinner

In England a single-storey extension to a bungalow follows the normal permitted development limits (3 m or 4 m, or 6 m and 8 m through prior approval). Adding a first floor always needs planning permission.

Homes in conservation areas, national parks, National Landscapes (formerly AONBs), the Broads and World Heritage Sites have tighter rules, so we always check the property's status and planning history before design starts.

Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.

If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.

Applications are decided by the local planning authority (your district, borough or unitary council).

Who a bungalow extension suits

  • Homeowners planning for later life
  • Bungalows on larger plots
  • Families wanting more space on one floor

Bungalow roofs are often hipped, which makes tying in an extension roof a careful job. We draw the roof junction early because it drives both the look and the cost.

From first visit to completion

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    It starts with a visit to your house to measure, check access and talk through ideas and budget.

  2. Design and approvals

    Once the layout is agreed, we deal with the council: planning permission or written confirmation that none is needed, plus building control.

  3. Fixed written price

    With the design and specification agreed, you get a fixed written price and a start date.

  4. Build and sign-off

    Our team builds the extension, keeps you updated weekly and finishes with building control sign-off.

Questions people ask about bungalow extensions

How long does a bungalow extension take to build in Pinner?

On site, typically 10 to 18 weeks once approvals are in place. Before that, allow 6–14 weeks design and approvals.

Can I see a price before committing to anything?

Yes. The guide prices on this page are adjusted for Pinner, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.

Who do I contract with for a bungalow extension in Pinner?

Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.

Can I extend a bungalow without planning permission?

In England a single-storey rear extension to a bungalow follows the same permitted development limits as a house: 3 m or 4 m, or up to 6 m or 8 m through prior approval. Adding a storey always needs planning permission.

Is it better to extend sideways or upwards?

Sideways and rearwards is usually simpler, cheaper and keeps single-level living. Upwards saves garden but means stairs, more structure and planning permission.

Book a free site visit in Pinner

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote