house-extension.uk

Morley bungalow extensions, designed and built

Planning a bungalow extension in Morley? We survey the house, work out the planning route, draw the design and build it, so you deal with one team from the first visit to the completion certificate.

  • Guide price in MorleyFrom £24,500 inc VAT
  • PlanningSingle storey often permitted development
  • Build time10–18 weeks on site
  • Postcode districtsBD11, LS10, LS11, LS27, WF3
Bungalow with a rear extension in matching brick and wide glazed doors

Bungalow extension prices in Morley

These guide figures apply our Yorkshire and the Humber adjustment (×0.94) to national rates. They include VAT at 20% and cover the build itself; design and council fees are listed separately.

Typical rates in Morley: £1,640 to £3,200 per m² including VAT, depending on specification.

SizeEssentialStandardPremium
3 m × 5 m
15 m²
£24,500 – £30,000£28,500 – £37,500£36,500 – £48,000
4 m × 6 m
24 m²
£39,000 – £47,500£46,000 – £60,000£58,500 – £77,000
L-shape
35 m²
£57,500 – £69,500£67,000 – £87,500£85,500 – £112,000

For a figure based on your own dimensions, use our guide-price tool.

Extensions in and around Morley

Across BD11, LS10, LS11, LS27, WF3, WF17, we can visit, measure and advise. Neighbouring towns we cover include Batley (3 miles), Dewsbury (4 miles), Heckmondwike (4 miles), Ossett (4 miles).

Homes across Yorkshire and the Humber range from back-to-back and through terraces to large suburban semis, and extension options vary with them.

Planning rules that apply in Morley

In England a single-storey extension to a bungalow follows the normal permitted development limits (3 m or 4 m, or 6 m and 8 m through prior approval). Adding a first floor always needs planning permission.

The planning position for a specific Morley address depends on its history and any designations, which is why we check it at the first visit.

Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.

If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.

Applications are decided by the local planning authority (your district, borough or unitary council).

When a bungalow extension makes sense

  • Homeowners planning for later life
  • Bungalows on larger plots
  • Families wanting more space on one floor

Bungalow roofs are often hipped, which makes tying in an extension roof a careful job. We draw the roof junction early because it drives both the look and the cost.

Our process, step by step

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    It starts with a visit to your house to measure, check access and talk through ideas and budget.

  2. Design and approvals

    We produce the drawings and structural design, and manage the approvals so they are in place before work starts.

  3. Fixed written price

    You receive a written, itemised price and programme. Nothing starts until you are happy with it.

  4. Build and sign-off

    Work is carried out to the agreed programme, inspected by building control and signed off at the end.

Your questions about a bungalow extension in Morley

Do you cover all of Morley?

Yes. We cover Morley and the surrounding parts of West Yorkshire. Site visits are free and there is no obligation.

Will my neighbours in Morley be involved?

If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.

How long does a bungalow extension take to build in Morley?

On site, typically 10 to 18 weeks once approvals are in place. Before that, allow 6–14 weeks design and approvals.

Can I extend a bungalow without planning permission?

In England a single-storey rear extension to a bungalow follows the same permitted development limits as a house: 3 m or 4 m, or up to 6 m or 8 m through prior approval. Adding a storey always needs planning permission.

Is it better to extend sideways or upwards?

Sideways and rearwards is usually simpler, cheaper and keeps single-level living. Upwards saves garden but means stairs, more structure and planning permission.

Book a free site visit in Morley

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote