Bungalow extensions in Maldon: design, approvals and build
Maldon homeowners can use us for the whole bungalow extension project: survey, design, planning or permitted development checks, building regulations and the build itself.
- Guide price in MaldonFrom £27,500 inc VAT
- PlanningSingle storey often permitted development
- Build time10–18 weeks on site
- Postcode districtsCM9

What should I budget for a bungalow extension in Maldon?
For Maldon we adjust our national guide rates by ×1.06, the factor we use for East of England. Figures include VAT; your written quote after the survey replaces them.
Typical rates in Maldon: £1,860 to £3,600 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| 3 m × 5 m 15 m² | £27,500 – £33,500 | £32,500 – £42,500 | £41,000 – £54,500 |
| 4 m × 6 m 24 m² | £44,500 – £53,500 | £52,000 – £67,500 | £66,000 – £86,500 |
| L-shape 35 m² | £64,500 – £78,000 | £76,000 – £98,500 | £96,000 – £126,500 |
Want a range for your exact size? The guide-price tool takes about a minute.
Do I need planning permission in Maldon?
In England a single-storey extension to a bungalow follows the normal permitted development limits (3 m or 4 m, or 6 m and 8 m through prior approval). Adding a first floor always needs planning permission.
In a conservation area, national park, National Landscape, the Broads or a World Heritage Site the permitted development limits are tighter (no side or two-storey extensions without an application). Listed homes need listed building consent, and if permitted development rights have been removed, any extension needs an application.
Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.
Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.
Applications are decided by the local planning authority (your district, borough or unitary council).
Covering Maldon
We cover Maldon and the postcode districts CM9. Nearby, we also take on projects in Witham (5 miles), Chelmsford (9 miles), Rayleigh (10 miles), Wickford (11 miles).
Sudbury, in Suffolk, is roughly 21 miles from Maldon and also on our list. Across the East of England many houses sit on generous plots, and single-storey and wraparound extensions are a natural fit.
When a bungalow extension makes sense
- Bungalows on larger plots
- Families wanting more space on one floor
- Homeowners planning for later life
Our process, step by step
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
It starts with a visit to your house to measure, check access and talk through ideas and budget.
Design and approvals
We draw the design, agree it with you and handle planning or permitted development checks and building regulations.
Fixed written price
The price is fixed in writing once the design is settled, with a clear programme and payment stages.
Build and sign-off
Work is carried out to the agreed programme, inspected by building control and signed off at the end.
Questions people ask about bungalow extensions
Do I need building regulations approval in Maldon?
Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.
Do you cover all of Maldon?
Yes. We cover Maldon and the surrounding parts of Essex. Site visits are free and there is no obligation.
How long does a bungalow extension take to build in Maldon?
On site, typically 10 to 18 weeks once approvals are in place. Before that, allow 6–14 weeks design and approvals.
Can I extend a bungalow without planning permission?
In England a single-storey rear extension to a bungalow follows the same permitted development limits as a house: 3 m or 4 m, or up to 6 m or 8 m through prior approval. Adding a storey always needs planning permission.
Is it better to extend sideways or upwards?
Sideways and rearwards is usually simpler, cheaper and keeps single-level living. Upwards saves garden but means stairs, more structure and planning permission.
Book a free site visit in Maldon
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.