house-extension.uk

Longton bungalow extensions, designed and built

Planning a bungalow extension in Longton? We survey the house, work out the planning route, draw the design and build it, so you deal with one team from the first visit to the completion certificate.

  • Guide price in LongtonFrom £25,000 inc VAT
  • PlanningSingle storey often permitted development
  • Build time10–18 weeks on site
  • Postcode districtsST3, ST4
Bungalow with a rear extension in matching brick and wide glazed doors

Covering Longton

We cover Longton and the postcode districts ST3, ST4. The same team covers Stoke-on-Trent (3 miles), Newcastle-under-Lyme (4 miles), Kidsgrove (8 miles), Leek (10 miles), all within easy reach.

Congleton, in Cheshire, is roughly 13 miles from Longton and also on our list. Across the West Midlands, brick-built semis with long gardens are common, so single-storey and two-storey rear extensions are popular choices.

Is a bungalow extension right for your house?

  • Bungalows on larger plots
  • Families wanting more space on one floor
  • Homeowners planning for later life

Bungalow extension prices in Longton

For Longton we adjust our national guide rates by ×0.97, the factor we use for West Midlands. Figures include VAT; your written quote after the survey replaces them.

Typical rates in Longton: £1,700 to £3,300 per m² including VAT, depending on specification.

SizeEssentialStandardPremium
3 m × 5 m
15 m²
£25,000 – £31,000£29,500 – £39,000£37,500 – £49,500
4 m × 6 m
24 m²
£40,500 – £49,000£47,500 – £62,000£60,500 – £79,500
L-shape
35 m²
£59,000 – £71,500£69,500 – £90,000£88,000 – £115,500

Try the guide-price tool to see a range for your own size and finish.

Do I need planning permission in Longton?

In England a single-storey extension to a bungalow follows the normal permitted development limits (3 m or 4 m, or 6 m and 8 m through prior approval). Adding a first floor always needs planning permission.

In a conservation area, national park, National Landscape, the Broads or a World Heritage Site the permitted development limits are tighter (no side or two-storey extensions without an application). Listed homes need listed building consent, and if permitted development rights have been removed, any extension needs an application.

If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.

Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.

Applications are decided by the local planning authority (your district, borough or unitary council).

What happens next

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    A designer visits, takes measurements and photos, and discusses layouts, budget and timing with you.

  2. Design and approvals

    We draw the design, agree it with you and handle planning or permitted development checks and building regulations.

  3. Fixed written price

    The price is fixed in writing once the design is settled, with a clear programme and payment stages.

  4. Build and sign-off

    Work is carried out to the agreed programme, inspected by building control and signed off at the end.

Questions people ask about bungalow extensions

Do I need building regulations approval in Longton?

Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.

Can I see a price before committing to anything?

Yes. The guide prices on this page are adjusted for Longton, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.

How long does a bungalow extension take to build in Longton?

On site, typically 10 to 18 weeks once approvals are in place. Before that, allow 6–14 weeks design and approvals.

Is it better to extend sideways or upwards?

Sideways and rearwards is usually simpler, cheaper and keeps single-level living. Upwards saves garden but means stairs, more structure and planning permission.

Can I extend a bungalow without planning permission?

In England a single-storey rear extension to a bungalow follows the same permitted development limits as a house: 3 m or 4 m, or up to 6 m or 8 m through prior approval. Adding a storey always needs planning permission.

Book a free site visit in Longton

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote