Bungalow extensions in Hawarden: design, approvals and build
From the first sketch to final sign-off, we plan and build bungalow extensions in Hawarden and the surrounding Clwyd area.
- Guide price in HawardenFrom £24,000 inc VAT
- PlanningWelsh permitted development rules (rear up to 4 m)
- Build time10–18 weeks on site
- Postcode districtsCH5

Local to Hawarden
Postcode districts we cover around Hawarden include CH5. Nearby, we also take on projects in Deeside (1 mile), Buckley (3 miles), Flint (6 miles), Wrexham (10 miles).
In Wales, terraced houses with rear offshoots are common in the towns, while detached houses and bungalows dominate in rural areas.
Bungalow extension prices in Hawarden
Prices below are for Hawarden, using the Wales factor of ×0.93. They are guide ranges including VAT for the build only, not a quote.
Typical rates in Hawarden: £1,630 to £3,160 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| 3 m × 5 m 15 m² | £24,000 – £29,500 | £28,500 – £37,000 | £36,000 – £47,500 |
| 4 m × 6 m 24 m² | £39,000 – £47,000 | £45,500 – £59,500 | £58,000 – £76,000 |
| L-shape 35 m² | £56,500 – £68,500 | £66,500 – £86,500 | £84,500 – £111,000 |
Try the guide-price tool to see a range for your own size and finish.
What is included
- Level thresholds and accessible layouts
- Roof designs that tie into the existing hipped or gable roof
- Planning application where needed
- Structural survey before any upward extension
- Single-storey extension options assessed first
Planning rules that apply in Hawarden
In Wales single-storey bungalow extensions follow the normal limits (up to 4 m at the rear); adding a storey needs planning permission.
The planning position for a specific Hawarden address depends on its history and any designations, which is why we check it at the first visit.
Building regulations approval is separate from planning. Wales has its own building regulations and approved documents; the council or a registered building control approver checks the plans, inspects the work and issues a completion certificate.
Building over or within 3 m of a public sewer needs the water company's consent before the foundations go in.
Applications are decided by the local planning authority (your county or county borough council, or the national park authority).
What happens next
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
It starts with a visit to your house to measure, check access and talk through ideas and budget.
Design and approvals
Once the layout is agreed, we deal with the council: planning permission or written confirmation that none is needed, plus building control.
Fixed written price
We confirm the build price in writing, based on the approved drawings and the finishes you have chosen.
Build and sign-off
We build it with one project manager, book the building control inspections and hand over the completion certificate.
Questions people ask about bungalow extensions
Can I see a price before committing to anything?
Yes. The guide prices on this page are adjusted for Hawarden, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.
Do you cover all of Hawarden?
Yes. We cover Hawarden and the surrounding parts of Clwyd. Site visits are free and there is no obligation.
Do I need building regulations approval in Hawarden?
Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.
How much does a bungalow extension cost?
Our guide range for single-storey work is about £1,630 to £3,160 per m² including VAT. Going upwards is priced after a structural survey.
Is it better to extend sideways or upwards?
Sideways and rearwards is usually simpler, cheaper and keeps single-level living. Upwards saves garden but means stairs, more structure and planning permission.
Book a free site visit in Hawarden
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.