Bungalow extensions for homes in Coventry
Planning a bungalow extension in Coventry? We survey the house, work out the planning route, draw the design and build it, so you deal with one team from the first visit to the completion certificate.
- Guide price in CoventryFrom £25,000 inc VAT
- PlanningSingle storey often permitted development
- Build time10–18 weeks on site
- Postcode districtsCV1, CV2, CV3, CV4, CV5

What should I budget for a bungalow extension in Coventry?
For Coventry we adjust our national guide rates by ×0.97, the factor we use for West Midlands. Figures include VAT; your written quote after the survey replaces them.
Typical rates in Coventry: £1,700 to £3,300 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| 3 m × 5 m 15 m² | £25,000 – £31,000 | £29,500 – £39,000 | £37,500 – £49,500 |
| 4 m × 6 m 24 m² | £40,500 – £49,000 | £47,500 – £62,000 | £60,500 – £79,500 |
| L-shape 35 m² | £59,000 – £71,500 | £69,500 – £90,000 | £88,000 – £115,500 |
Want a range for your exact size? The guide-price tool takes about a minute.
When a bungalow extension makes sense
- Homeowners planning for later life
- Bungalows on larger plots
- Families wanting more space on one floor
Covering Coventry
Across CV1, CV2, CV3, CV4, CV5, CV6, we can visit, measure and advise. The same team covers Solihull (11 miles), Shirley (13 miles), Sutton Coldfield (17 miles), Birmingham (17 miles), all within easy reach.
Across the West Midlands, brick-built semis with long gardens are common, so single-storey and two-storey rear extensions are popular choices.
Planning rules that apply in Coventry
In England a single-storey extension to a bungalow follows the normal permitted development limits (3 m or 4 m, or 6 m and 8 m through prior approval). Adding a first floor always needs planning permission.
The planning position for a specific Coventry address depends on its history and any designations, which is why we check it at the first visit.
Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.
Applications are decided by the local planning authority (your district, borough or unitary council).
From first visit to completion
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
A designer visits, takes measurements and photos, and discusses layouts, budget and timing with you.
Design and approvals
Drawings are prepared and agreed with you, then submitted for the right planning route and building regulations approval.
Fixed written price
You receive a written, itemised price and programme. Nothing starts until you are happy with it.
Build and sign-off
Our team builds the extension, keeps you updated weekly and finishes with building control sign-off.
Questions people ask about bungalow extensions
Do I need building regulations approval in Coventry?
Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.
How long does a bungalow extension take to build in Coventry?
On site, typically 10 to 18 weeks once approvals are in place. Before that, allow 6–14 weeks design and approvals.
Will my neighbours in Coventry be involved?
If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.
Is it better to extend sideways or upwards?
Sideways and rearwards is usually simpler, cheaper and keeps single-level living. Upwards saves garden but means stairs, more structure and planning permission.
Can I extend a bungalow without planning permission?
In England a single-storey rear extension to a bungalow follows the same permitted development limits as a house: 3 m or 4 m, or up to 6 m or 8 m through prior approval. Adding a storey always needs planning permission.
Book a free site visit in Coventry
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.