Our design and build teams take on bungalow extensions in Canterbury, from the first measured survey through planning and building control to the finished room.

  • Guide price in CanterburyFrom £29,000 inc VAT
  • PlanningSingle storey often permitted development
  • Build time10–18 weeks on site
  • Postcode districtsCT1, CT2
Bungalow with a rear extension in matching brick and wide glazed doors

Bungalow extension prices in Canterbury

Prices below are for Canterbury, using the South East England factor of ×1.12. They are guide ranges including VAT for the build only, not a quote.

Typical rates in Canterbury: £1,960 to £3,810 per m² including VAT, depending on specification.

SizeEssentialStandardPremium
3 m × 5 m
15 m²
£29,000 – £35,500£34,000 – £45,000£43,500 – £57,500
4 m × 6 m
24 m²
£47,000 – £56,500£55,000 – £71,500£69,500 – £91,500
L-shape
35 m²
£68,500 – £82,500£80,000 – £104,000£101,500 – £133,500

For a figure based on your own dimensions, use our guide-price tool.

Working in Canterbury

Site visits are available across Canterbury (CT1, CT2). Nearby, we also take on projects in Whitstable (6 miles), Herne Bay (7 miles), Faversham (9 miles), Ashford, Kent (13 miles).

Just over the Essex border, Southend-on-Sea is about 24 miles away. The South East has a broad mix of 1930s semis, post-war estates, newer developments and period cottages, and many houses have enough garden for a generous rear extension.

Do I need planning permission in Canterbury?

In England a single-storey extension to a bungalow follows the normal permitted development limits (3 m or 4 m, or 6 m and 8 m through prior approval). Adding a first floor always needs planning permission.

The planning position for a specific Canterbury address depends on its history and any designations, which is why we check it at the first visit.

If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.

Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.

Applications are decided by the local planning authority (your district, borough or unitary council).

What is included

  • Planning application where needed
  • Structural survey before any upward extension
  • Level thresholds and accessible layouts
  • Single-storey extension options assessed first

Bungalow roofs are often hipped, which makes tying in an extension roof a careful job. We draw the roof junction early because it drives both the look and the cost.

What happens next

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    First, a site visit: we look at the house, garden, access and drains and listen to what you need.

  2. Design and approvals

    Drawings are prepared and agreed with you, then submitted for the right planning route and building regulations approval.

  3. Fixed written price

    We confirm the build price in writing, based on the approved drawings and the finishes you have chosen.

  4. Build and sign-off

    Our team builds the extension, keeps you updated weekly and finishes with building control sign-off.

Questions people ask about bungalow extensions

Do you cover all of Canterbury?

Yes. We cover Canterbury and the surrounding parts of Kent. Site visits are free and there is no obligation.

Can I see a price before committing to anything?

Yes. The guide prices on this page are adjusted for Canterbury, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.

How long does a bungalow extension take to build in Canterbury?

On site, typically 10 to 18 weeks once approvals are in place. Before that, allow 6–14 weeks design and approvals.

Is it better to extend sideways or upwards?

Sideways and rearwards is usually simpler, cheaper and keeps single-level living. Upwards saves garden but means stairs, more structure and planning permission.

Can I extend a bungalow without planning permission?

In England a single-storey rear extension to a bungalow follows the same permitted development limits as a house: 3 m or 4 m, or up to 6 m or 8 m through prior approval. Adding a storey always needs planning permission.

Book a free site visit in Canterbury

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote