Bungalow extensions in Bristol
Our design and build teams take on bungalow extensions in Bristol, from the first measured survey through planning and building control to the finished room.
- Guide priceFrom £26,500 inc VAT
- PlanningSingle storey often permitted development
- Towns coveredWhole area
- Site visitFree, no obligation

Towns in Bristol
We cover the whole of Bristol.
Guide prices for Bristol
Labour and material costs vary across the UK, so for Bristol we use our South West England factor (×1.02). The ranges include VAT and exclude design, structural and council fees.
Typical rates in Bristol: £1,780 to £3,470 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| 3 m × 5 m 15 m² | £26,500 – £32,500 | £31,000 – £41,000 | £39,500 – £52,500 |
| 4 m × 6 m 24 m² | £42,500 – £51,500 | £50,000 – £65,000 | £63,500 – £83,500 |
| L-shape 35 m² | £62,000 – £75,000 | £73,000 – £95,000 | £92,500 – £121,500 |
Try the guide-price tool to see a range for your own size and finish.
Planning rules that apply in Bristol
In England a single-storey extension to a bungalow follows the normal permitted development limits (3 m or 4 m, or 6 m and 8 m through prior approval). Adding a first floor always needs planning permission.
In a conservation area, national park, National Landscape, the Broads or a World Heritage Site the permitted development limits are tighter (no side or two-storey extensions without an application). Listed homes need listed building consent, and if permitted development rights have been removed, any extension needs an application.
Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.
If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.
Applications are decided by the local planning authority (your district, borough or unitary council).
Covering Bristol
We cover the whole of Bristol. South West homes range from terraced streets in the cities to stone cottages and bungalows in the countryside, and conservation areas are common in historic centres.
Included in a typical project
- Planning application where needed
- Roof designs that tie into the existing hipped or gable roof
- Single-storey extension options assessed first
- Structural survey before any upward extension
- Level thresholds and accessible layouts
Our process, step by step
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
A designer visits, takes measurements and photos, and discusses layouts, budget and timing with you.
Design and approvals
Once the layout is agreed, we deal with the council: planning permission or written confirmation that none is needed, plus building control.
Fixed written price
With the design and specification agreed, you get a fixed written price and a start date.
Build and sign-off
Work is carried out to the agreed programme, inspected by building control and signed off at the end.
Your questions about a bungalow extension in Bristol
Will my neighbours in Bristol be involved?
If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.
Can I see a price before committing to anything?
Yes. The guide prices on this page are adjusted for Bristol, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.
How long does a bungalow extension take to build in Bristol?
On site, typically 10 to 18 weeks once approvals are in place. Before that, allow 6–14 weeks design and approvals.
Is it better to extend sideways or upwards?
Sideways and rearwards is usually simpler, cheaper and keeps single-level living. Upwards saves garden but means stairs, more structure and planning permission.
Can I extend a bungalow without planning permission?
In England a single-storey rear extension to a bungalow follows the same permitted development limits as a house: 3 m or 4 m, or up to 6 m or 8 m through prior approval. Adding a storey always needs planning permission.
Book a free site visit in Bristol
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.