Bexhill-on-Sea bungalow extensions, designed and built
Bexhill-on-Sea homeowners can use us for the whole bungalow extension project: survey, design, planning or permitted development checks, building regulations and the build itself.
- Guide price in Bexhill-on-SeaFrom £29,000 inc VAT
- PlanningSingle storey often permitted development
- Build time10–18 weeks on site
- Postcode districtsTN39, TN40

How much does a bungalow extension cost in Bexhill-on-Sea?
For Bexhill-on-Sea we adjust our national guide rates by ×1.12, the factor we use for South East England. Figures include VAT; your written quote after the survey replaces them.
Typical rates in Bexhill-on-Sea: £1,960 to £3,810 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| 3 m × 5 m 15 m² | £29,000 – £35,500 | £34,000 – £45,000 | £43,500 – £57,500 |
| 4 m × 6 m 24 m² | £47,000 – £56,500 | £55,000 – £71,500 | £69,500 – £91,500 |
| L-shape 35 m² | £68,500 – £82,500 | £80,000 – £104,000 | £101,500 – £133,500 |
Want a range for your exact size? The guide-price tool takes about a minute.
Who a bungalow extension suits
- Bungalows on larger plots
- Homeowners planning for later life
- Families wanting more space on one floor
Covering Bexhill-on-Sea
Postcode districts we cover around Bexhill-on-Sea include TN39, TN40. Nearby, we also take on projects in Hastings (5 miles), Hailsham (9 miles), Eastbourne (10 miles), Seaford (17 miles).
Just over the Kent border, Tunbridge Wells is about 22 miles away. The South East has a broad mix of 1930s semis, post-war estates, newer developments and period cottages, and many houses have enough garden for a generous rear extension.
Will the council need to approve it?
In England a single-storey extension to a bungalow follows the normal permitted development limits (3 m or 4 m, or 6 m and 8 m through prior approval). Adding a first floor always needs planning permission.
The planning position for a specific Bexhill-on-Sea address depends on its history and any designations, which is why we check it at the first visit.
Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.
Applications are decided by the local planning authority (your district, borough or unitary council).
How the project works
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
First, a site visit: we look at the house, garden, access and drains and listen to what you need.
Design and approvals
We produce the drawings and structural design, and manage the approvals so they are in place before work starts.
Fixed written price
You receive a written, itemised price and programme. Nothing starts until you are happy with it.
Build and sign-off
Our team builds the extension, keeps you updated weekly and finishes with building control sign-off.
Bungalow extension questions answered
How long does a bungalow extension take to build in Bexhill-on-Sea?
On site, typically 10 to 18 weeks once approvals are in place. Before that, allow 6–14 weeks design and approvals.
Do I need building regulations approval in Bexhill-on-Sea?
Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.
Do you cover all of Bexhill-on-Sea?
Yes. We cover Bexhill-on-Sea and the surrounding parts of East Sussex. Site visits are free and there is no obligation.
Is it better to extend sideways or upwards?
Sideways and rearwards is usually simpler, cheaper and keeps single-level living. Upwards saves garden but means stairs, more structure and planning permission.
Can I extend a bungalow without planning permission?
In England a single-storey rear extension to a bungalow follows the same permitted development limits as a house: 3 m or 4 m, or up to 6 m or 8 m through prior approval. Adding a storey always needs planning permission.
Book a free site visit in Bexhill-on-Sea
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end