house-extension.uk

Bungalow extensions in Accrington

Accrington homeowners can use us for the whole bungalow extension project: survey, design, planning or permitted development checks, building regulations and the build itself.

  • Guide price in AccringtonFrom £24,500 inc VAT
  • PlanningSingle storey often permitted development
  • Build time10–18 weeks on site
  • Postcode districtsBB5
Bungalow with a rear extension in matching brick and wide glazed doors

Covering Accrington

Postcode districts we cover around Accrington include BB5. Neighbouring towns we cover include Rawtenstall (5 miles), Blackburn (5 miles), Darwen (6 miles), Burnley (6 miles).

Across the North West, terraced houses with small rear yards suit compact rear and side return extensions, while suburban semis have room for more.

Guide prices for Accrington

These guide figures apply our North West England adjustment (×0.95) to national rates. They include VAT at 20% and cover the build itself; design and council fees are listed separately.

Typical rates in Accrington: £1,660 to £3,230 per m² including VAT, depending on specification.

SizeEssentialStandardPremium
3 m × 5 m
15 m²
£24,500 – £30,000£29,000 – £38,000£37,000 – £48,500
4 m × 6 m
24 m²
£39,500 – £48,000£46,500 – £60,500£59,000 – £78,000
L-shape
35 m²
£58,000 – £70,000£68,000 – £88,500£86,000 – £113,500

For a figure based on your own dimensions, use our guide-price tool.

Planning rules that apply in Accrington

In England a single-storey extension to a bungalow follows the normal permitted development limits (3 m or 4 m, or 6 m and 8 m through prior approval). Adding a first floor always needs planning permission.

Before any drawing is finalised we check whether the house is listed, in a conservation area or subject to an Article 4 direction.

If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.

Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.

Applications are decided by the local planning authority (your district, borough or unitary council).

When a bungalow extension makes sense

  • Families wanting more space on one floor
  • Homeowners planning for later life
  • Bungalows on larger plots

Our process, step by step

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    It starts with a visit to your house to measure, check access and talk through ideas and budget.

  2. Design and approvals

    Once the layout is agreed, we deal with the council: planning permission or written confirmation that none is needed, plus building control.

  3. Fixed written price

    We confirm the build price in writing, based on the approved drawings and the finishes you have chosen.

  4. Build and sign-off

    Our team builds the extension, keeps you updated weekly and finishes with building control sign-off.

Bungalow extension questions answered

Do you cover all of Accrington?

Yes. We cover Accrington and the surrounding parts of Lancashire. Site visits are free and there is no obligation.

Who do I contract with for a bungalow extension in Accrington?

Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.

How long does a bungalow extension take to build in Accrington?

On site, typically 10 to 18 weeks once approvals are in place. Before that, allow 6–14 weeks design and approvals.

How much does a bungalow extension cost?

Our guide range for single-storey work is about £1,660 to £3,230 per m² including VAT. Going upwards is priced after a structural survey.

Is it better to extend sideways or upwards?

Sideways and rearwards is usually simpler, cheaper and keeps single-level living. Upwards saves garden but means stairs, more structure and planning permission.

Book a free site visit in Accrington

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote