Bedroom extensions in Stamford
A bedroom extension in Stamford starts with the right design and the right approval route. We take care of both, then build it with our own project management.
- Guide price in StamfordFrom £24,500 inc VAT
- PlanningUsually a householder application
- Build time14–22 weeks on site
- Postcode districtsPE9

Covering Stamford
Our survey diary covers Stamford, including PE9. Neighbouring towns we cover include Spalding (17 miles), Grantham (19 miles), Boston (30 miles), Lincoln (40 miles).
For homes towards Rutland, Oakham is around 9 miles away. Homes across the East Midlands often have usable side land or a driveway beside the house, which opens up side and wraparound options.
How much does a bedroom extension cost in Stamford?
For Stamford we adjust our national guide rates by ×0.95, the factor we use for East Midlands. Figures include VAT; your written quote after the survey replaces them.
Typical rates in Stamford: £1,520 to £3,040 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| One bedroom 12 m² | £24,500 – £30,500 | £24,500 – £32,000 | £27,000 – £36,500 |
| Bedroom and en-suite 18 m² | £27,000 – £33,500 | £32,000 – £42,000 | £41,000 – £55,000 |
| Two rooms 30 m² | £45,500 – £56,000 | £54,000 – £70,000 | £68,000 – £91,500 |
Want a range for your exact size? The guide-price tool takes about a minute.
What is included
- Planning drawings and application
- Fire safety: escape windows and smoke alarms to building regulations
- Structure, roof, insulation and finish
- Heating extended to the new rooms
- En-suite drainage and ventilation design
- Layout options: two-storey, over-garage or ground floor
Do I need planning permission in Stamford?
In England a two-storey rear extension is permitted development only if it projects no more than 3 m from the original rear wall, sits at least 7 m from the rear boundary, matches the roof pitch and uses obscure, non-opening side windows upstairs. Most two-storey extensions therefore go through a householder planning application, which costs £548 from 1 April 2026 and normally takes about 8 weeks.
Before any drawing is finalised we check whether the house is listed, in a conservation area or subject to an Article 4 direction.
Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.
If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.
Applications are decided by the local planning authority (your district, borough or unitary council).
What happens next
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
First, a site visit: we look at the house, garden, access and drains and listen to what you need.
Design and approvals
Once the layout is agreed, we deal with the council: planning permission or written confirmation that none is needed, plus building control.
Fixed written price
You receive a written, itemised price and programme. Nothing starts until you are happy with it.
Build and sign-off
The build is managed from start to finish, inspected at each stage and signed off on completion.
Common questions in Stamford
Can I see a price before committing to anything?
Yes. The guide prices on this page are adjusted for Stamford, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.
How long does a bedroom extension take to build in Stamford?
On site, typically 14 to 22 weeks once approvals are in place. Before that, allow 8–14 weeks design and approvals.
Do you cover all of Stamford?
Yes. We cover Stamford and the surrounding parts of Lincolnshire. Site visits are free and there is no obligation.
Can I add a ground-floor bedroom for a relative?
Yes. A ground-floor bedroom with an accessible shower room is a common request. If it will be lived in as a self-contained home, planning treats it differently, so tell us how it will be used.
Does an en-suite need a window?
No, but it needs mechanical extraction that meets the building regulations. We design the duct route at the drawing stage.
Book a free site visit in Stamford
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.