Bedroom extensions in Portslade

Our design and build teams take on bedroom extensions in Portslade, from the first measured survey through planning and building control to the finished room.

  • Guide price in PortsladeFrom £29,000 inc VAT
  • PlanningUsually a householder application
  • Build time14–22 weeks on site
  • Postcode districtsBN3, BN41
Bedroom in an extension with a roof window and an en-suite shower room

Who a bedroom extension suits

  • Growing families
  • Homeowners who want an en-suite master bedroom
  • Multi-generational households

New bedrooms on an upper floor need an escape window or a protected route to the outside under the building regulations. We design the window sizes and stair route to meet that from the outset.

Guide prices for Portslade

Prices below are for Portslade, using the South East England factor of ×1.12. They are guide ranges including VAT for the build only, not a quote.

Typical rates in Portslade: £1,790 to £3,580 per m² including VAT, depending on specification.

SizeEssentialStandardPremium
One bedroom
12 m²
£29,000 – £35,500£29,000 – £38,000£32,000 – £43,500
Bedroom and en-suite
18 m²
£32,000 – £39,500£38,000 – £49,500£48,000 – £65,000
Two rooms
30 m²
£53,500 – £66,000£63,500 – £82,500£80,500 – £108,000

For a figure based on your own dimensions, use our guide-price tool.

Working in Portslade

Our survey diary covers Portslade, including BN3, BN41. Nearby, we also take on projects in Hove (2 miles), Brighton (3 miles), Peacehaven (10 miles), Seaford (15 miles).

Just over the West Sussex border, Shoreham-by-Sea is about 3 miles away. The South East has a broad mix of 1930s semis, post-war estates, newer developments and period cottages, and many houses have enough garden for a generous rear extension.

Will the council need to approve it?

In England a two-storey rear extension is permitted development only if it projects no more than 3 m from the original rear wall, sits at least 7 m from the rear boundary, matches the roof pitch and uses obscure, non-opening side windows upstairs. Most two-storey extensions therefore go through a householder planning application, which costs £548 from 1 April 2026 and normally takes about 8 weeks.

Before any drawing is finalised we check whether the house is listed, in a conservation area or subject to an Article 4 direction.

If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.

Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.

Applications are decided by the local planning authority (your district, borough or unitary council).

Our process, step by step

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    A designer visits, takes measurements and photos, and discusses layouts, budget and timing with you.

  2. Design and approvals

    We produce the drawings and structural design, and manage the approvals so they are in place before work starts.

  3. Fixed written price

    We confirm the build price in writing, based on the approved drawings and the finishes you have chosen.

  4. Build and sign-off

    The build is managed from start to finish, inspected at each stage and signed off on completion.

Bedroom extension questions answered

Will my neighbours in Portslade be involved?

If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.

Can I see a price before committing to anything?

Yes. The guide prices on this page are adjusted for Portslade, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.

How long does a bedroom extension take to build in Portslade?

On site, typically 14 to 22 weeks once approvals are in place. Before that, allow 8–14 weeks design and approvals.

Can I add a ground-floor bedroom for a relative?

Yes. A ground-floor bedroom with an accessible shower room is a common request. If it will be lived in as a self-contained home, planning treats it differently, so tell us how it will be used.

Will a new bedroom need planning permission?

Upstairs additions usually do. Ground-floor rooms may fall within permitted development, depending on size and position.

Book a free site visit in Portslade

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote