Bedroom extensions across Falmouth
From the first sketch to final sign-off, we plan and build bedroom extensions in Falmouth and the surrounding Cornwall area.
- Guide price in FalmouthFrom £26,500 inc VAT
- PlanningUsually a householder application
- Build time14–22 weeks on site
- Postcode districtsTR10, TR11

How much does a bedroom extension cost in Falmouth?
Labour and material costs vary across the UK, so for Falmouth we use our South West England factor (×1.02). The ranges include VAT and exclude design, structural and council fees.
Typical rates in Falmouth: £1,630 to £3,260 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| One bedroom 12 m² | £26,500 – £32,500 | £26,500 – £34,500 | £29,000 – £39,500 |
| Bedroom and en-suite 18 m² | £29,000 – £36,000 | £34,500 – £45,000 | £44,000 – £59,000 |
| Two rooms 30 m² | £48,500 – £60,000 | £58,000 – £75,000 | £73,000 – £98,000 |
Want a range for your exact size? The guide-price tool takes about a minute.
Local to Falmouth
We cover Falmouth and the postcode districts TR10, TR11. The same team covers Truro (8 miles), Redruth (9 miles), Camborne (11 miles), Newquay (18 miles), all within easy reach.
In the South West, local stone, render and brick vary from town to town, so matching materials is a big part of designing an extension that looks right.
Is a bedroom extension right for your house?
- Growing families
- Multi-generational households
- Homeowners who want an en-suite master bedroom
New bedrooms on an upper floor need an escape window or a protected route to the outside under the building regulations. We design the window sizes and stair route to meet that from the outset.
Do I need planning permission in Falmouth?
In England a two-storey rear extension is permitted development only if it projects no more than 3 m from the original rear wall, sits at least 7 m from the rear boundary, matches the roof pitch and uses obscure, non-opening side windows upstairs. Most two-storey extensions therefore go through a householder planning application, which costs £548 from 1 April 2026 and normally takes about 8 weeks.
Before any drawing is finalised we check whether the house is listed, in a conservation area or subject to an Article 4 direction.
Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.
Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.
Applications are decided by the local planning authority (your district, borough or unitary council).
Our process, step by step
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
First, a site visit: we look at the house, garden, access and drains and listen to what you need.
Design and approvals
We draw the design, agree it with you and handle planning or permitted development checks and building regulations.
Fixed written price
You receive a written, itemised price and programme. Nothing starts until you are happy with it.
Build and sign-off
The build is managed from start to finish, inspected at each stage and signed off on completion.
Bedroom extension questions answered
Will my neighbours in Falmouth be involved?
If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.
Can I see a price before committing to anything?
Yes. The guide prices on this page are adjusted for Falmouth, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.
Do you cover all of Falmouth?
Yes. We cover Falmouth and the surrounding parts of Cornwall. Site visits are free and there is no obligation.
Will a new bedroom need planning permission?
Upstairs additions usually do. Ground-floor rooms may fall within permitted development, depending on size and position.
Does an en-suite need a window?
No, but it needs mechanical extraction that meets the building regulations. We design the duct route at the drawing stage.
Book a free site visit in Falmouth
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end