house-extension.uk

East Grinstead bedroom extensions, designed and built

Our design and build teams take on bedroom extensions in East Grinstead, from the first measured survey through planning and building control to the finished room.

  • Guide price in East GrinsteadFrom £29,000 inc VAT
  • PlanningUsually a householder application
  • Build time14–22 weeks on site
  • Postcode districtsRH19
Bedroom in an extension with a roof window and an en-suite shower room

What we take care of

  • Structure, roof, insulation and finish
  • Heating extended to the new rooms
  • Planning drawings and application
  • En-suite drainage and ventilation design
  • Fire safety: escape windows and smoke alarms to building regulations
  • Layout options: two-storey, over-garage or ground floor

New bedrooms on an upper floor need an escape window or a protected route to the outside under the building regulations. We design the window sizes and stair route to meet that from the outset.

Covering East Grinstead

We cover East Grinstead and the postcode districts RH19. We also work in nearby Crawley (8 miles), Haywards Heath (10 miles), Burgess Hill (13 miles), Horsham (15 miles).

In the South East, plenty of houses have already been extended once, which makes checking the remaining permitted development allowance an important early step.

Bedroom extension prices in East Grinstead

For East Grinstead we adjust our national guide rates by ×1.12, the factor we use for South East England. Figures include VAT; your written quote after the survey replaces them.

Typical rates in East Grinstead: £1,790 to £3,580 per m² including VAT, depending on specification.

SizeEssentialStandardPremium
One bedroom
12 m²
£29,000 – £35,500£29,000 – £38,000£32,000 – £43,500
Bedroom and en-suite
18 m²
£32,000 – £39,500£38,000 – £49,500£48,000 – £65,000
Two rooms
30 m²
£53,500 – £66,000£63,500 – £82,500£80,500 – £108,000

Try the guide-price tool to see a range for your own size and finish.

Do I need planning permission in East Grinstead?

In England a two-storey rear extension is permitted development only if it projects no more than 3 m from the original rear wall, sits at least 7 m from the rear boundary, matches the roof pitch and uses obscure, non-opening side windows upstairs. Most two-storey extensions therefore go through a householder planning application, which costs £548 from 1 April 2026 and normally takes about 8 weeks.

Before any drawing is finalised we check whether the house is listed, in a conservation area or subject to an Article 4 direction.

Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.

Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.

Applications are decided by the local planning authority (your district, borough or unitary council).

What happens next

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    First, a site visit: we look at the house, garden, access and drains and listen to what you need.

  2. Design and approvals

    Drawings are prepared and agreed with you, then submitted for the right planning route and building regulations approval.

  3. Fixed written price

    We confirm the build price in writing, based on the approved drawings and the finishes you have chosen.

  4. Build and sign-off

    Our team builds the extension, keeps you updated weekly and finishes with building control sign-off.

Bedroom extension questions answered

Who do I contract with for a bedroom extension in East Grinstead?

Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.

How long does a bedroom extension take to build in East Grinstead?

On site, typically 14 to 22 weeks once approvals are in place. Before that, allow 8–14 weeks design and approvals.

Do I need building regulations approval in East Grinstead?

Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.

How much does a bedroom extension cost?

Our guide range is about £1,790 to £3,580 per m² including VAT. A bedroom with an en-suite of about 18 m² is typically £38,000 to £49,500 at standard spec, depending on whether it is part of a larger two-storey build.

Can I add a ground-floor bedroom for a relative?

Yes. A ground-floor bedroom with an accessible shower room is a common request. If it will be lived in as a self-contained home, planning treats it differently, so tell us how it will be used.

Book a free site visit in East Grinstead

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote