Bedroom extensions for homes in Chesterfield
Chesterfield homeowners can use us for the whole bedroom extension project: survey, design, planning or permitted development checks, building regulations and the build itself.
- Guide price in ChesterfieldFrom £24,500 inc VAT
- PlanningUsually a householder application
- Build time14–22 weeks on site
- Postcode districtsS18, S40, S41, S42, S43

Bedroom extension prices in Chesterfield
Prices below are for Chesterfield, using the East Midlands factor of ×0.95. They are guide ranges including VAT for the build only, not a quote.
Typical rates in Chesterfield: £1,520 to £3,040 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| One bedroom 12 m² | £24,500 – £30,500 | £24,500 – £32,000 | £27,000 – £36,500 |
| Bedroom and en-suite 18 m² | £27,000 – £33,500 | £32,000 – £42,000 | £41,000 – £55,000 |
| Two rooms 30 m² | £45,500 – £56,000 | £54,000 – £70,000 | £68,000 – £91,500 |
Try the guide-price tool to see a range for your own size and finish.
Planning rules that apply in Chesterfield
In England a two-storey rear extension is permitted development only if it projects no more than 3 m from the original rear wall, sits at least 7 m from the rear boundary, matches the roof pitch and uses obscure, non-opening side windows upstairs. Most two-storey extensions therefore go through a householder planning application, which costs £548 from 1 April 2026 and normally takes about 8 weeks.
In a conservation area, national park, National Landscape, the Broads or a World Heritage Site the permitted development limits are tighter (no side or two-storey extensions without an application). Listed homes need listed building consent, and if permitted development rights have been removed, any extension needs an application.
Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.
Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.
Applications are decided by the local planning authority (your district, borough or unitary council).
What is included
- En-suite drainage and ventilation design
- Heating extended to the new rooms
- Planning drawings and application
- Structure, roof, insulation and finish
Local to Chesterfield
Across S18, S40, S41, S42, S43, S44, we can visit, measure and advise. Nearby, we also take on projects in Staveley (3 miles), Dronfield (4 miles), Alfreton (11 miles), Ripley (15 miles).
Just over the South Yorkshire border, Sheffield is about 9 miles away. The East Midlands has plenty of inter-war and post-war semis and detached houses with room to extend, alongside Victorian terraces in the towns.
How the project works
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
First, a site visit: we look at the house, garden, access and drains and listen to what you need.
Design and approvals
Drawings are prepared and agreed with you, then submitted for the right planning route and building regulations approval.
Fixed written price
The price is fixed in writing once the design is settled, with a clear programme and payment stages.
Build and sign-off
Our team builds the extension, keeps you updated weekly and finishes with building control sign-off.
Common questions in Chesterfield
Will my neighbours in Chesterfield be involved?
If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.
Do you cover all of Chesterfield?
Yes. We cover Chesterfield and the surrounding parts of Derbyshire. Site visits are free and there is no obligation.
Do I need building regulations approval in Chesterfield?
Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.
Will a new bedroom need planning permission?
Upstairs additions usually do. Ground-floor rooms may fall within permitted development, depending on size and position.
Does an en-suite need a window?
No, but it needs mechanical extraction that meets the building regulations. We design the duct route at the drawing stage.
Book a free site visit in Chesterfield
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.