Bedroom extensions in Briton Ferry

We design and build bedroom extensions for houses in Briton Ferry, with a written price once the survey and design are done and one point of contact throughout.

  • Guide price in Briton FerryFrom £24,000 inc VAT
  • PlanningUsually a planning application
  • Build time14–22 weeks on site
  • Postcode districtsSA12
Bedroom in an extension with a roof window and an en-suite shower room

When a bedroom extension makes sense

  • Homeowners who want an en-suite master bedroom
  • Multi-generational households
  • Growing families

Extensions in and around Briton Ferry

Our survey diary covers Briton Ferry, including SA12. We also work in nearby Neath (2 miles), Clydach (5 miles), Swansea (5 miles), Gorseinon (10 miles).

In Wales, terraced houses with rear offshoots are common in the towns, while detached houses and bungalows dominate in rural areas.

What should I budget for a bedroom extension in Briton Ferry?

For Briton Ferry we adjust our national guide rates by ×0.93, the factor we use for Wales. Figures include VAT; your written quote after the survey replaces them.

Typical rates in Briton Ferry: £1,490 to £2,980 per m² including VAT, depending on specification.

SizeEssentialStandardPremium
One bedroom
12 m²
£24,000 – £29,500£24,000 – £31,500£26,500 – £36,000
Bedroom and en-suite
18 m²
£26,500 – £33,000£31,500 – £41,500£40,000 – £54,000
Two rooms
30 m²
£44,500 – £54,500£53,000 – £68,500£66,500 – £89,500

For a figure based on your own dimensions, use our guide-price tool.

Will the council need to approve it?

In Wales a rear extension of more than one storey can be permitted development only if the ground floor projects no more than 4 m, the upper floor no more than 3 m, it stays at least 10.5 m from the rear boundary and it is not in a conservation area, national park, National Landscape or World Heritage Site. Anything larger needs a planning application to the council.

Before any drawing is finalised we check whether the house is listed, in a conservation area or subject to an Article 4 direction.

The Party Wall etc. Act 1996 applies in Wales as in England: notice must be served before work to a shared wall, building on the boundary, or excavating close to a neighbour's foundations.

Building regulations approval is separate from planning. Wales has its own building regulations and approved documents; the council or a registered building control approver checks the plans, inspects the work and issues a completion certificate.

Applications are decided by the local planning authority (your county or county borough council, or the national park authority).

How the project works

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    We visit your Briton Ferry home, measure up, talk through what you want and check the planning position.

  2. Design and approvals

    Drawings are prepared and agreed with you, then submitted for the right planning route and building regulations approval.

  3. Fixed written price

    You receive a written, itemised price and programme. Nothing starts until you are happy with it.

  4. Build and sign-off

    We build it with one project manager, book the building control inspections and hand over the completion certificate.

Bedroom extension questions answered

Can I see a price before committing to anything?

Yes. The guide prices on this page are adjusted for Briton Ferry, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.

How long does a bedroom extension take to build in Briton Ferry?

On site, typically 14 to 22 weeks once approvals are in place. Before that, allow 8–14 weeks design and approvals.

Who do I contract with for a bedroom extension in Briton Ferry?

Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.

Will a new bedroom need planning permission?

Upstairs additions usually do. Ground-floor rooms may fall within permitted development, depending on size and position.

Does an en-suite need a window?

No, but it needs mechanical extraction that meets the building regulations. We design the duct route at the drawing stage.

Book a free site visit in Briton Ferry

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote