Annexe extensions in Stroud: design, approvals and build
From the first sketch to final sign-off, we plan and build annexe extensions in Stroud and the surrounding Gloucestershire area.
- Guide price in StroudFrom £56,000 inc VAT
- PlanningUsually a householder application
- Build time16–24 weeks on site
- Postcode districtsGL5, GL6

Guide prices for Stroud
For Stroud we adjust our national guide rates by ×1.02, the factor we use for South West England. Figures include VAT; your written quote after the survey replaces them.
Typical rates in Stroud: £2,040 to £3,880 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| Studio annexe 25 m² | £56,000 – £70,500 | £61,000 – £76,500 | £76,500 – £97,000 |
| One-bedroom annexe 35 m² | £71,000 – £89,500 | £85,500 – £107,500 | £107,000 – £136,000 |
| Larger annexe 45 m² | £91,500 – £115,000 | £110,000 – £138,000 | £137,500 – £174,500 |
Try the guide-price tool to see a range for your own size and finish.
What is included
- Separate or shared heating and hot water
- Fire separation and alarms to building regulations
- Kitchenette, shower room and bedroom finish
- Design for accessibility: level thresholds, wider doors, walk-in shower
- Planning application describing ancillary use
Accessibility is cheaper to design in than to retrofit. Level access, a 900 mm door width, a level-access shower and space to turn a wheelchair can all be planned into the footprint for little extra cost.
Extensions in and around Stroud
Across GL5, GL6, we can visit, measure and advise. Neighbouring towns we cover include Dursley (8 miles), Gloucester (8 miles), Cirencester (10 miles), Cheltenham (12 miles).
Ross-on-Wye, in Herefordshire, is roughly 20 miles from Stroud and also on our list. South West homes range from terraced streets in the cities to stone cottages and bungalows in the countryside, and conservation areas are common in historic centres.
Will the council need to approve it?
In England an annexe that stays part of the household and connects to the house is assessed as an extension, but its size usually takes it beyond permitted development, so a householder application describing the ancillary use is the normal route.
Before any drawing is finalised we check whether the house is listed, in a conservation area or subject to an Article 4 direction.
Building over or within 3 m of a public sewer needs the water company's consent, usually through a build-over agreement, before the foundations go in.
Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.
Applications are decided by the local planning authority (your district, borough or unitary council).
Our process, step by step
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
A designer visits, takes measurements and photos, and discusses layouts, budget and timing with you.
Design and approvals
We draw the design, agree it with you and handle planning or permitted development checks and building regulations.
Fixed written price
You receive a written, itemised price and programme. Nothing starts until you are happy with it.
Build and sign-off
The build is managed from start to finish, inspected at each stage and signed off on completion.
Common questions in Stroud
Will my neighbours in Stroud be involved?
If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.
Can I see a price before committing to anything?
Yes. The guide prices on this page are adjusted for Stroud, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.
Do I need building regulations approval in Stroud?
Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.
Does an annexe extension need planning permission?
Usually yes, because of its size and the way it will be used. Councils check that it stays ancillary to the main house, so the application must describe the use clearly.
Can the annexe have its own front door?
Yes, many do, but it should still connect to the main house to stay clearly part of it.
Book a free site visit in Stroud
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end