house-extension.uk

Annexe extensions across Stranraer

A annexe extension in Stranraer starts with the right design and the right approval route. We take care of both, then build it with our own project management.

  • Guide price in StranraerFrom £53,500 inc VAT
  • PlanningScottish householder rules; building warrant needed
  • Build time16–24 weeks on site
  • Postcode districtsDG9
Single-storey annexe extension with its own front door and canopy

Local to Stranraer

Site visits are available across Stranraer (DG9). Nearby, we also take on projects in Dumfries (57 miles), Annan (71 miles).

Scotland's housing includes sandstone villas, terraces and tenements in the cities and plenty of post-war and modern houses and bungalows elsewhere. A building warrant is needed before work starts.

What we take care of

  • Planning application describing ancillary use
  • Fire separation and alarms to building regulations
  • Kitchenette, shower room and bedroom finish
  • Separate or shared heating and hot water
  • Design for accessibility: level thresholds, wider doors, walk-in shower

Guide prices for Stranraer

For Stranraer we adjust our national guide rates by ×0.98, the factor we use for Scotland. Figures include VAT; your written quote after the survey replaces them.

Typical rates in Stranraer: £1,960 to £3,720 per m² including VAT, depending on specification.

SizeEssentialStandardPremium
Studio annexe
25 m²
£53,500 – £67,500£58,500 – £73,500£73,500 – £93,500
One-bedroom annexe
35 m²
£68,500 – £86,000£82,000 – £103,000£102,500 – £130,500
Larger annexe
45 m²
£88,000 – £110,500£105,500 – £132,500£132,000 – £168,000

Want a range for your exact size? The guide-price tool takes about a minute.

Planning rules that apply in Stranraer

In Scotland, householder permitted development rules (Class 1A for single-storey ground-floor extensions and Class 1B for extensions of more than one storey) allow some smaller extensions without a planning application, within limits on depth, height and distance from the boundary. Conservation areas and listed buildings are more restricted.

In a conservation area or national scenic area the householder permitted development rights are more limited, listed homes need listed building consent, and if rights have been removed by a condition or direction, any extension needs an application.

In Scotland a building warrant from the council is needed before work starts on almost any extension, and a completion certificate is issued when the work is accepted. Building standards are set in the Scottish technical handbooks.

Applications are decided by your council as planning authority.

What happens next

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    We visit your Stranraer home, measure up, talk through what you want and check the planning position.

  2. Design and approvals

    Once the layout is agreed, we deal with the council: planning permission or written confirmation that none is needed, plus building control.

  3. Fixed written price

    You receive a written, itemised price and programme. Nothing starts until you are happy with it.

  4. Build and sign-off

    The build is managed from start to finish, inspected at each stage and signed off on completion.

Common questions in Stranraer

Do you cover all of Stranraer?

Yes. We cover Stranraer and the surrounding parts of Dumfries and Galloway. Site visits are free and there is no obligation.

Can I see a price before committing to anything?

Yes. The guide prices on this page are adjusted for Stranraer, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.

Who do I contract with for an annexe extension in Stranraer?

Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.

Does an annexe extension need planning permission?

Usually yes, because of its size and the way it will be used. Councils check that it stays ancillary to the main house, so the application must describe the use clearly.

Can the annexe have its own front door?

Yes, many do, but it should still connect to the main house to stay clearly part of it.

Book a free site visit in Stranraer

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote