Staines-upon-Thames annexe extensions, designed and built
Staines-upon-Thames homeowners can use us for the whole annexe extension project: survey, design, planning or permitted development checks, building regulations and the build itself.
- Guide price in Staines-upon-ThamesFrom £61,500 inc VAT
- PlanningUsually a householder application
- Build time16–24 weeks on site
- Postcode districtsTW15, TW18, TW19, TW20

Guide prices for Staines-upon-Thames
Prices below are for Staines-upon-Thames, using the South East England factor of ×1.12. They are guide ranges including VAT for the build only, not a quote.
Typical rates in Staines-upon-Thames: £2,240 to £4,260 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| Studio annexe 25 m² | £61,500 – £77,500 | £67,000 – £84,500 | £84,000 – £106,500 |
| One-bedroom annexe 35 m² | £78,000 – £98,500 | £94,000 – £118,000 | £117,500 – £149,000 |
| Larger annexe 45 m² | £100,500 – £126,500 | £120,500 – £151,500 | £151,000 – £192,000 |
Try the guide-price tool to see a range for your own size and finish.
Who an annexe extension suits
- Homes with a large side or rear garden
- Multi-generational families
- Relatives who need support close by
Will the council need to approve it?
In England an annexe that stays part of the household and connects to the house is assessed as an extension, but its size usually takes it beyond permitted development, so a householder application describing the ancillary use is the normal route.
In a conservation area, national park, National Landscape, the Broads or a World Heritage Site the permitted development limits are tighter (no side or two-storey extensions without an application). Listed homes need listed building consent, and if permitted development rights have been removed, any extension needs an application.
Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.
Applications are decided by the local planning authority (your district, borough or unitary council).
Working in Staines-upon-Thames
Our survey diary covers Staines-upon-Thames, including TW15, TW18, TW19, TW20. We also work in nearby Egham (2 miles), Ashford, Surrey (2 miles), Sunbury-on-Thames (4 miles), Weybridge (5 miles).
Homes across the South East range from Victorian terraces in the older town centres to large detached houses on the edges, so the right extension type varies street by street.
What happens next
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
We visit your Staines-upon-Thames home, measure up, talk through what you want and check the planning position.
Design and approvals
Drawings are prepared and agreed with you, then submitted for the right planning route and building regulations approval.
Fixed written price
You receive a written, itemised price and programme. Nothing starts until you are happy with it.
Build and sign-off
Our team builds the extension, keeps you updated weekly and finishes with building control sign-off.
Annexe extension questions answered
Will my neighbours in Staines-upon-Thames be involved?
If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.
Do you cover all of Staines-upon-Thames?
Yes. We cover Staines-upon-Thames and the surrounding parts of Surrey. Site visits are free and there is no obligation.
Who do I contract with for an annexe extension in Staines-upon-Thames?
Your contract is with S&K Property Investments and Improvement Ltd, which designs and manages the project and the build teams who carry it out.
Does an annexe extension need planning permission?
Usually yes, because of its size and the way it will be used. Councils check that it stays ancillary to the main house, so the application must describe the use clearly.
Can the annexe have its own front door?
Yes, many do, but it should still connect to the main house to stay clearly part of it.
Book a free site visit in Staines-upon-Thames
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end
Prefer to talk? Call 0800 088 6341 or .
Book a free site visit
Tell us a little about the project and we will arrange a time.