house-extension.uk

Annexe extensions for homes in Lincoln

Lincoln homeowners can use us for the whole annexe extension project: survey, design, planning or permitted development checks, building regulations and the build itself.

  • Guide price in LincolnFrom £52,000 inc VAT
  • PlanningUsually a householder application
  • Build time16–24 weeks on site
  • Postcode districtsLN1, LN2, LN5, LN6
Single-storey annexe extension with its own front door and canopy

Do I need planning permission in Lincoln?

In England an annexe that stays part of the household and connects to the house is assessed as an extension, but its size usually takes it beyond permitted development, so a householder application describing the ancillary use is the normal route.

Before any drawing is finalised we check whether the house is listed, in a conservation area or subject to an Article 4 direction.

If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.

Building regulations approval is separate from planning. In England you can use the council's building control team or a registered building control approver; a full plans application gets the drawings checked before work starts, and the inspector signs the work off with a completion certificate.

Applications are decided by the local planning authority (your district, borough or unitary council).

Working in Lincoln

Our survey diary covers Lincoln, including LN1, LN2, LN5, LN6. Nearby, we also take on projects in Gainsborough (14 miles), Grantham (22 miles), Scunthorpe (25 miles), Boston (27 miles).

For homes towards Nottinghamshire, Newark-on-Trent is around 16 miles away. Homes across the East Midlands often have usable side land or a driveway beside the house, which opens up side and wraparound options.

How much does an annexe extension cost in Lincoln?

Labour and material costs vary across the UK, so for Lincoln we use our East Midlands factor (×0.95). The ranges include VAT and exclude design, structural and council fees.

Typical rates in Lincoln: £1,900 to £3,610 per m² including VAT, depending on specification.

SizeEssentialStandardPremium
Studio annexe
25 m²
£52,000 – £65,500£57,000 – £71,500£71,000 – £90,500
One-bedroom annexe
35 m²
£66,500 – £83,500£79,500 – £100,000£99,500 – £126,500
Larger annexe
45 m²
£85,500 – £107,000£102,500 – £128,500£128,000 – £162,500

Try the guide-price tool to see a range for your own size and finish.

What is included

  • Fire separation and alarms to building regulations
  • Separate or shared heating and hot water
  • Planning application describing ancillary use
  • Kitchenette, shower room and bedroom finish

What happens next

Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.

  1. Free site visit

    A designer visits, takes measurements and photos, and discusses layouts, budget and timing with you.

  2. Design and approvals

    We draw the design, agree it with you and handle planning or permitted development checks and building regulations.

  3. Fixed written price

    You receive a written, itemised price and programme. Nothing starts until you are happy with it.

  4. Build and sign-off

    The build is managed from start to finish, inspected at each stage and signed off on completion.

Questions people ask about annexe extensions

Can I see a price before committing to anything?

Yes. The guide prices on this page are adjusted for Lincoln, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.

Do I need building regulations approval in Lincoln?

Yes. Almost every extension needs it, whatever the planning route. We prepare the drawings and book the inspections.

How long does an annexe extension take to build in Lincoln?

On site, typically 16 to 24 weeks once approvals are in place. Before that, allow 10–16 weeks design and approvals.

Can the annexe have its own front door?

Yes, many do, but it should still connect to the main house to stay clearly part of it.

Does an annexe extension need planning permission?

Usually yes, because of its size and the way it will be used. Councils check that it stays ancillary to the main house, so the application must describe the use clearly.

Book a free site visit in Lincoln

We will measure up, check the planning position and give you honest guide figures.

  • Free, no-obligation site visit
  • Planning route checked before you spend on drawings
  • Written price once the design is agreed
  • Building control sign-off at the end

Prefer to talk? Call 0800 088 6341 or .

Book a free site visit

Tell us a little about the project and we will arrange a time.

Please enter a valid UK postcode.
Please choose an option.
Please enter your name.
Please enter a phone number.
Please enter a valid email.

We use your details only to reply to this enquiry and prepare your quote. Privacy notice.

Call usGet a quote