Leek annexe extensions, designed and built
From the first sketch to final sign-off, we plan and build annexe extensions in Leek and the surrounding Staffordshire area.
- Guide price in LeekFrom £53,000 inc VAT
- PlanningUsually a householder application
- Build time16–24 weeks on site
- Postcode districtsST13

Local to Leek
We cover Leek and the postcode districts ST13. The same team covers Kidsgrove (9 miles), Longton (10 miles), Stoke-on-Trent (10 miles), Newcastle-under-Lyme (11 miles), all within easy reach.
Just over the Cheshire border, Congleton is about 9 miles away. Across the West Midlands, brick-built semis with long gardens are common, so single-storey and two-storey rear extensions are popular choices.
How much does an annexe extension cost in Leek?
For Leek we adjust our national guide rates by ×0.97, the factor we use for West Midlands. Figures include VAT; your written quote after the survey replaces them.
Typical rates in Leek: £1,940 to £3,690 per m² including VAT, depending on specification.
| Size | Essential | Standard | Premium |
|---|---|---|---|
| Studio annexe 25 m² | £53,000 – £67,000 | £58,000 – £73,000 | £72,500 – £92,500 |
| One-bedroom annexe 35 m² | £67,500 – £85,000 | £81,000 – £102,000 | £101,500 – £129,500 |
| Larger annexe 45 m² | £87,000 – £109,500 | £104,500 – £131,000 | £130,500 – £166,000 |
Try the guide-price tool to see a range for your own size and finish.
Planning and approvals in Leek
In England an annexe that stays part of the household and connects to the house is assessed as an extension, but its size usually takes it beyond permitted development, so a householder application describing the ancillary use is the normal route.
In a conservation area, national park, National Landscape, the Broads or a World Heritage Site the permitted development limits are tighter (no side or two-storey extensions without an application). Listed homes need listed building consent, and if permitted development rights have been removed, any extension needs an application.
If the work involves a shared wall, building on the boundary, or digging foundations within 3 m (sometimes 6 m) of a neighbour's building, the Party Wall etc. Act 1996 applies and notice must be served before work starts: two months for work to a party wall, one month for new walls on the boundary and for excavations.
Applications are decided by the local planning authority (your district, borough or unitary council).
When an annexe extension makes sense
- Homes with a large side or rear garden
- Multi-generational families
- Relatives who need support close by
Accessibility is cheaper to design in than to retrofit. Level access, a 900 mm door width, a level-access shower and space to turn a wheelchair can all be planned into the footprint for little extra cost.
From first visit to completion
Site visits are free and there is no obligation. Where drawings are needed, the design stage is priced in writing before it starts.
Free site visit
We visit your Leek home, measure up, talk through what you want and check the planning position.
Design and approvals
Drawings are prepared and agreed with you, then submitted for the right planning route and building regulations approval.
Fixed written price
The price is fixed in writing once the design is settled, with a clear programme and payment stages.
Build and sign-off
The build is managed from start to finish, inspected at each stage and signed off on completion.
Annexe extension questions answered
Will my neighbours in Leek be involved?
If a planning application or prior approval is needed, the council notifies neighbours. If the work is on or near a shared boundary, party wall notices may also be needed.
How long does an annexe extension take to build in Leek?
On site, typically 16 to 24 weeks once approvals are in place. Before that, allow 10–16 weeks design and approvals.
Can I see a price before committing to anything?
Yes. The guide prices on this page are adjusted for Leek, and the guide-price tool gives a range for your own size. After the survey you get a written price before anything is agreed.
Will an annexe affect council tax?
It can. Some annexes are assessed separately for council tax, with discounts or exemptions in some cases when occupied by a relative. Check with the Valuation Office Agency (England and Wales), your local assessor (Scotland) or Land & Property Services (Northern Ireland).
Does an annexe extension need planning permission?
Usually yes, because of its size and the way it will be used. Councils check that it stays ancillary to the main house, so the application must describe the use clearly.
Book a free site visit in Leek
We will measure up, check the planning position and give you honest guide figures.
- Free, no-obligation site visit
- Planning route checked before you spend on drawings
- Written price once the design is agreed
- Building control sign-off at the end